My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono Substation Expansion - Enviromental Assessment (1)
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono Substation Expansion - Enviromental Assessment (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:46 PM
Creation date
9/23/2021 2:52:01 PM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 4.2.12 Notice of Permit <br /> I The Permittee shall inform all employees, contractors, and other persons involved in the <br /> transmission line construction of the terms and conditions of this permit. <br /> 1 4.3 Periodic Status Reports <br /> The Permittee shall report to the Commission on progress regarding finalization of the route, <br /> I design of structures, and construction of the transmission line. The Permittee need not report <br /> more frequently than weekly. <br /> I At the request of the Commission,the Permittee shall report to the Commission on progress <br /> regarding finalization of the route and design of structures. P,,- Permittee shall report to the <br /> Commission on construction of the Project in a manner o ed • the Environmental <br /> Management Plan under Section 5.1 Special Conditions. <br /> I4.4 Complaint Procedures <br /> Prior to the start of construction,the PermittePo,; u. -. the Commission,the procedures <br /> I that will be used to receive and respond to c e: . s. T e procedures shall be in accordance <br /> with the requirements set forth in the co in 'ocedures attached to this permit. <br /> I4.5 Notification to Landowner ,, t <br /> The Permittee shall provide alffectei-fin vers with a copy of this permit and the <br /> I complaints procedures at the ti e ot?st contact with the landowners after issuance of this <br /> permit. At the time of fir con ,the ermittee i11 o pr. �'de all affected landowners with <br /> a copy of the Lando nide t asements .ublic to . . ided by OES. <br /> The Permittee shall contact landowners prior 11-. ;-ring the property or conducting maintenance <br /> along the route. The IPermittee shall avoid cone .n and maintenance practices,particularly <br /> the use of fertilize herbicides or other_ esticide ,that are inconsistent with the landowner's or <br /> tenant's use of the l + . <br /> I The Permittee shall work with landowners to locate the high-voltage transmission lines to <br /> minimize the loss of agricultural land, forest, and wetlands, and to avoid homes and farmsteads. <br /> 1 4.6 Completion of Construction <br /> 4.6.1 Notification to Commission <br /> 1 At least three days before the line is to be placed into service,the Permittee shall notify <br /> the Commission of the date on which the line will be placed into service and the date on <br /> Iwhich construction was complete. <br /> 4.6.2 As-Builts <br /> I Within 60 days after completion of construction,the Permittee shall submit copies of all <br /> the final as-built plans and specifications developed during the project. <br /> INovember 2010 Page 1 13 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.