Laserfiche WebLink
Energy Facility Permitting <br /> Scoping Decision Document <br /> PUC Docket No.E002/TL-11-223 <br /> V. AFFECTED ENVIRONMENT, POTENTIAL IMPACTS, AND <br /> MITIGATIVE MEASURES <br /> A. Environmental Setting <br /> B. Socioeconomic and Cultural Setting <br /> C. Human Settlement <br /> 1. Noise <br /> 2. Aesthetics ( including existing trees and right-of-way clearing, pole <br /> heights, substation) <br /> 3. Existing Utilities (pipelines,propane tanks, septic systems) <br /> 4. Property Values <br /> D. Public Health and Safety <br /> 1. Electric and Magnetic Fields <br /> 2. Implantable Medical Devices <br /> 3. Stray Voltage <br /> 4. Air Quality Associated with the Transmission Facility <br /> E. Recreation <br /> 1. Parks (city, county,regional, state, and federal) <br /> 2. Trails <br /> F. Transportation and Public Services <br /> 1. Roads and Highways <br /> 2. Emergency Services <br /> 3. Airports <br /> G. Interference <br /> 1. Radio (AM/FM and Short-wave) <br /> 2. Television(satellite and digital) <br /> 3. Global Positioning Devices <br /> 4. Cellular Phone <br /> 5. Wireless Internet <br /> H. Archaeological and Historic Resources <br /> I. Land Use (land-based economies) <br /> 1. Mining <br /> 2. Commercial <br /> 3. Tourism <br /> 4. Agriculture <br /> 5. Forestry <br /> 5 of 9 <br />