My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-01-2021 Park Commission Meeting Minutes
Orono
>
Park Commission
>
Minutes
>
2020-2029
>
2021
>
02-01-2021 Park Commission Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 8:48:30 AM
Creation date
8/30/2021 8:48:18 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Show annotations
View images
View plain text
MINUTES OF THE <br /> ORONO PARK COMMISSION <br /> Monday,February 1,2021 <br /> 6:00 o'clock p.m. <br /> Roath agreed. <br /> PUBLIC WORKS UPDATE <br /> Edwards updated the Parks Commission and noted it is a quiet time of the year. Right now, some of the <br /> highlights include:they picked up regional trail maintenance so they are maintaining Three Rivers' trails <br /> in Orono and got a new piece of equipment to do it so they are doing the Dakota as well as the other parts <br /> of the Independence trail. He noted they have always done the trail in front of the school as it is like a <br /> sidewalk but had not done the others. The Golf Course has still been busy;they did the holiday <br /> decorations,putting them up and taking them down,they have done a couple rounds of dead tree <br /> removals and trimming out there and worked with Sentence To Serve which is a Hennepin County <br /> Corrections Department initiative for labor to do some of that and it has worked out well. Edwards said <br /> February is when they start recruiting seasonal employees for the next golf season so Jason Goehring has <br /> already started that. In the meantime all of the golf course equipment that maintains the fairways and <br /> greens is rotated through annual maintenance. One trouble point this winter is the establishment of the ice <br /> rink at Casco Point Rink—they have yet to get it to a skateable surface as the cycles of warm weather <br /> have been hugely detrimental and they have some upset residents out there. It is sometimes hard to <br /> explain to people why the lake is frozen solid but they cannot get an ice rink on the ground to freeze and it <br /> has to do with how deep the frost is in to the ground. If the ground is not frozen solid for a good foot or <br /> so underneath,the water just dissipates and they end up with holes all over. Edwards said Goehring <br /> wants to look at doing some improvements out there this summer,perhaps bringing in some clay and <br /> trying to compact it and see if they can get a better sub-swale in there to make it work better. In the <br /> engineering world,Edwards said Big Island is still happening with lots of work there. The initial trail <br /> work was completed before the freeze so mid-to-late November that work was done. They did get <br /> bonding bill money and he has been working on the grant application with the State and as Carter <br /> mentioned the sign concept plan is underway and was approved by the City Council. Hopefully they will <br /> be set for construction this summer as soon as they can get the contractor back out to the island. As <br /> previously mentioned the second toilet,the shelter, and the sign program have all been approved and back <br /> into the plan. Things that are still pending are additional trail work that they could use the bonding <br /> money for, and the actual signs once they have the concept put together. Edwards is also working with <br /> Three Rivers on the Dakota Trail connection;they completed 90%design review before the holidays and <br /> they are looking to get that out for bid in February and March. That is a connection from Navarre Park up <br /> to the Dakota Trail on the west side of CR 19; it is a pretty pricey segment of trail because of the terrain <br /> and they are in a 3-way agreement between the City of Orono,Three Rivers Park District, and Hennepin <br /> County on cost-sharing that equally between the three and getting it done. Three Rivers has been leading <br /> the design effort and hopefully they will have some good news. He noted they have been trying to get it <br /> built for about five years and luckily there is some grant money that Three Rivers has that the timeline is <br /> running out on and they are anxious to get it done this year. Edwards said they have been soliciting <br /> quotes for the dock and swim platforms for the beaches. <br /> Roath asked the timing on the construction of the Dakota Trail connection. <br /> Edwards said this summer.It will be a challenge for those who live in Navarre as it will probably result in <br /> a several week closure of at least one lane of County Road 19. Hennepin County is also about to close <br /> down Tanager Bridge for that reconstruction. <br /> Roath noted they do not have a discussion on Summit Beach playground discussion. <br /> Page 12 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).