My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic/sewer info
Orono
>
Property Files
>
Street Address
>
B
>
Bay Ridge Road
>
1473 Bay Ridge Road - 10-117-23-34-0005
>
Septic
>
Septic/sewer info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:26:44 PM
Creation date
8/10/2015 2:05:06 PM
Metadata
Fields
Template:
x Address Old
House Number
1473
Street Name
Bay Ridge
Street Type
Road
Address
1473 Bay Ridge Road
Document Type
Septic
PIN
1011723340005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thomas R.McCune <br /> MORT�N�O� Executive Vice President <br /> C.E.O.•Building Division <br /> The Cnnstruction OrXmti�a�ion�' <br /> P.O.Box 710 <br /> Minneapolis, Minnesota 55440-0710 <br /> AU USt 2, 1996 700 Meadow Lane North <br /> g Minneapolis, Minnesota 55422-4899 <br /> Mr. Mike Gaffron Telephone:(612)522-2100 <br /> City of Orono Facsimile:(612)287-5224 <br /> P.O. Box 66 <br /> Crystal Bay, MN 55323 <br /> Re: Zoning Application #2084 <br /> Dear Mike: <br /> As you know, I was granted a zoning variance in December 1995 to place a sunroom addition on <br /> the east side of my home (which has been completed) and to add a bedroom/garage addition to <br /> the west, which would replace an existing detached garage. The latter work cannot commence <br /> until municipal sewer is installed and my existing onsite septic system is vacated. <br /> In reviewing the approval by the city council, the variance approval expires one year after the <br /> initial date of approval therefore the building permit application must presumably be submitted <br /> and approved no later than December 11, 1996. <br /> In view of the continuing delay with the overall municipal sewer issue, I am requesting your <br /> guidance regarding any action which I should take. In view of the situation, could this variance <br /> be extended for one additional year? <br /> If the variance can't be extended,would it make sense for me to submit plans for approval and <br /> obtain the building permit prior to December 1 1, 1996 and then hope that municipal sewer would <br /> be installed before the end of 1997? Obviously 1 don't want to have to go through a new <br /> variance process or be subjected to the possibility of not being able to eventually have an <br /> attached garaae. <br /> Thanks in advance for your he(p on this matter. <br /> Sincere , <br /> / / / <br /> �'�%�'< `" v�-�-- <br /> Thomas R. McCune 6 <br /> Executive Vice President <br /> AU� ` � �' <br /> TM/I►nh <br /> Minneapolis • Seattle • Denver • Colorado Springs • Milwaukee • Grand Rapids • San Diego <br /> San Francisco • Honolulu • Los Angeles <br />
The URL can be used to link to this page
Your browser does not support the video tag.