Laserfiche WebLink
�pNp CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> 7207 <br /> NO. <br /> <4, <br /> ES <br /> the existing day care center, and need for onsite circulation. The Council finds flexibility <br /> is appropriate given the high intensity uses surround the property (Wayzata Blvd to the <br /> south,Senior Housing to the east,and a gas station to the west.)If the parcel was not zoned <br /> RPUD,there would be no hardcover limitation due to the site distance from lakes. <br /> 14. Easements Required. Standard perimeter drainage and utility easements around all <br /> property boundaries will be required. Additional easement or property may be requested <br /> by Hennepin County to permit expansion of the stormwater pond east of the site, for <br /> Hennepin Council retention and treatment needs. <br /> 15. Trail. Connection to the trail along Wayzata Blvd is required. <br /> 16. 10% Private Park RPUD Requirement. The private recreation area of '10% of the <br /> platted property' required under the RPUD standards will be satisfied via various amenities <br /> proposed by the applicant,including dog run,roof top deck,community room,and exercise <br /> room. <br /> 17. Stormwater Management. Stormwater management is proposed to be provided by the <br /> existing stormwater pond area east of the site. The stormwater facilities will be subject to <br /> standard drainage easements. In addition to the City of Orono, the Minnehaha Creek <br /> Watershed District have approval authority over the applicants' stormwater management <br /> plan. Final stormwater plans will be subject to the recommendations and approval of the <br /> City Engineer. <br /> 18. The applicant has provided General Concept Plans and Preliminary Plat Drawings attached <br /> to this Resolution as Exhibits A-1 through A-19 including: <br /> Plans prepared by Loucks and Associates: <br /> Al —Preliminary Plat dated 5-19-21 <br /> A2—Existing Conditions Plan Sheet C1-1—dated 6-14-21 <br /> A3—Demolition Plan Sheet C1-2—dated 6-14-21 <br /> A4—Site Plan Sheet C2-1—dated 6-14-21 <br /> A5—Grading and Drainage Plan Sheet C3-1—dated 6-14-21 <br /> A6—SWPPP Sheet C3-2—dated 6-14-21 <br /> A7—SWPPP Notes Sheet C3-3—dated 6-14-21 <br /> A8—Utility Plan Sheet C4-1—dated 6-14-21 <br /> A9—Detail Sheets Sheet C8-1—dated 6-14-21 <br /> Al0—Landscape Plan Sheet L1-1—dated 6-14-21 <br /> All —Landscape Details Sheet L2-1—dated 6-14-21 <br /> Plans prepared by Mohegan Hanson,Architect: <br /> Al2—Title Sheet <br /> All —Sheet A200—Floor Plan Lower Level dated 6-19-21 <br /> 6 <br />