Laserfiche WebLink
r� <br />M <br />N <br />O <br />N <br />0 <br />100 <br />0 <br />CL <br />Resolution No. 7207 <br />a <br />GRADING & DRAINAGE NOTES <br />SEE STORMWATER POLLUTION PREVENTION PLAN FOR SOIL STABILIZATION INFORMATION. <br />EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE ESTABLISHED AROUND THE ENTIRE <br />1017.25 TW1018.0 TW SITE PERIMETER AND IN ACCORDANCE WITH NPDES PERMIT REQUIREMENTS, BEST MANAGEMENT <br />1017.0 GW 1017.1 GW 1018.5 TW PRACTICES, CITY REQUIREMENTS AND THE DETAILS SHOWN ON THE CIVIL DETAILS SHEETS OF THESE <br />1017.1 GW PLANS. <br />ALL CURB SPOT ELEVATIONS ARE TO GUTTER LINE -UNLESS NOTED OTHERWISE. <br />1017.75 TW <br />1017.5 GW <br />016.5 <br />1017.25 TW <br />1017.0 GW <br />1017.75 TW <br />1017.5 GW <br />1017.25 TW <br />1012.0 GW <br />C <br />50TW <br />000.6 GW <br />a� <br />d .',e <br />GRADING, DRAINAGE & EROSION CONTROL SPECIFICATIONS <br />1. SPOT ELEVATIONS REPRESENT FINISHED SURFACE GRADES, GUTTER/FLOW LINE, FACE OF BUILDING, <br />OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. <br />2. CATCH BASINS AND MANHOLES IN PAVED AREAS SHALL BE SUMPED 0.04 FEET. ALL CATCH BASINS <br />IN GUTTERS SHALL BE SUMPED 0.10 FEET. RIM ELEVATIONS SHOWN ON PLANS DO NOT REFLECT <br />SUMPED ELEVATIONS. <br />3. ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE MINIMUM OF 4 INCHES OF PREMIUM TOPSOIL <br />AND SEED/MULCH OR SOD. THESE AREAS SHALL BE WATERED/MAINTAINED BY THE CONTRACTOR <br />UNTIL VEGETATION IS ESTABLISHED. VERIFY WITH LANDSCAPE PLAN. <br />4. FOR SITE RETAINING WALLS "TW" EQUALS SURFACE GRADE AT TOP FACE OF WALL (NOT TOP OF <br />WALL), "GW" EQUALS SURFACE GRADE AT BOTTOM FACE OF WALL (NOT BOTTOM OF BURIED <br />WALL COURSES). <br />5. REFER TO THE REPORT OF GEOTECHNICAL EXPLORATION AND REVIEW (REPORT NO.16.61753.100), <br />DATED 12/08/16 AS PREPARED BY NORTHERN TECHNOLOGIES INC. FOR AN EXISTING SUBSURFACE <br />SITE CONDITION ANALYSIS AND CONSTRUCTION RECOMMENDATIONS. <br />6. STREETS MUST BE CLEANED AND SWEPT WHENEVER TRACKING OF SEDIMENTS OCCURS AND <br />BEFORE SITES ARE LEFT IDLE FOR WEEKENDS AND HOLIDAYS, OR AS DIRECTED BY CITY. A REGULAR <br />SWEEPING SCHEDULE MUST BE ESTABLISHED. <br />7. DUST MUST BE ADEQUATELY CONTROLLED. <br />8. SEE SWPPP FOR ADDITIONAL EROSION CONTROL NOTES AND REQUIREMENTS. <br />9. SEE UTILITY PLAN FOR WATER, STORM AND SANITARY SEWER INFORMATION. <br />10. SEE SITE PLAN FOR CURB AND BITUMINOUS TAPER LOCATIONS. <br />11. A STREET SWEEPER MUST BE AVAILABLE WITHIN 3 HOURS UPON NOTICE FROM THE CITY THAT THE <br />STREETS NEED TO BE SWEPT. <br />12. THE CONTRACTOR ALONG WITH THE OWNER SHALL OBTAIN ALL NECESSARY PERMITS AND <br />APPROVALS FROM GOVERNING AUTHORITIES, INCLUDING ANY CITY PERMITS AND THE NPDES <br />PERMIT FROM THE MPCA. <br />13. INSTALL EROSION CONTROL AND TREE PROTECTION MEASURES BEFORE BEGINNING SITE GRADING <br />ACTIVITIES. SOME EROSION CONTROLS SUCH AS BALE CHECKS AND TEMPORARY SILT PONDS MAY <br />BE INSTALLED AS GRADING OCCURS IN SPECIFIC AREAS. MAINTAIN EROSION CONTROLS <br />THROUGHOUT THE GRADING PROCESS AND REMOVE WHEN TURF HAS BEEN ESTABLISHED. <br />14. THE CONTRACTOR SHALL ADHERE TO ALL REQUIREMENTS OF THE MPCA NPDES PERMIT. THE AREA <br />TO BE DISTURBED SHALL BE MINIMIZED AND TURF SHALL BE ESTABLISHED WITHIN THE TIME <br />REQUIRED. <br />15. GRADES SHOWN ARE FINISHED GRADES. <br />16. FINAL GRADING TOLERANCES ARE +/-0.1 FEET TO FINISH GRADES. <br />17. UNDER PAVEMENTS COMPACT THE UPPER 3 FEET OF SUBGRADE TO 100% STANDARD PROCTOR <br />DENSITY AT OPTIMUM MOISTURE CONTENT AND 95% STANDARD PROCTOR DENSITY BLOW THE <br />UPPER 3 FEET OF SUBGRADE. OUTSIDE PAVEMENT AREAS COMPACT EMBANKMENTS TO 95% <br />STANDARD PROCTOR DENSITY. <br />18. WORKING HOURS ARE 7:00 AM - 10:00 PM, MONDAY -SATURDAY. A 48 HOUR NOTICED IS <br />REQUIRED FOR SATURDAY WORK. <br />19. THE CONTRACTOR MUST HAVE A CITY LICENSE. <br />20. A CITY RIGHT-OF-WAY PERMIT IS REQUIRED PRIOR TO WORKING WITHIN CITY ROW. <br />21. TURF REINFORCEMENT MAT (TRM) SHALL BE LANDLOK 450, AS MANUFACTURED BY PROPEX <br />GEOSOLUTIONS, OR APPROVED EQUAL. THE CONTRACTOR SHALL FOLLOW ALL OF THE <br />MANUFACTURERS INSTRUCTIONS FOR INSTALLATION. <br />22. STRUCTURAL RETAINING WALL, FENCING AND HANDRAIL DESIGN BY OTHERS. REFER TO <br />ARCHITECTURAL PLANS. <br />23. REGIONAL POND AND STORM SEWER EAST OF THE SITE MUST BE REVIEWED BY THE CITY AND <br />CONTRACTOR PRIOR TO ANY WORK. THE POND BOTTOM MUST BE VERIFIED WITH SURVEY PRIOR <br />TO ANY WORK, AND ONCE WORK COMMENCES, THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />REMOVING ANY SEDIMENT ADDED TO THE POND OR SEWER DUE TO SITE CONSTRUCTION. CITY <br />TO BE GIVEN 48 HOURS NOTICE BEFORE REVIEW IS WANTED. <br />24. RECORD DRAWINGS MUST BE SUBMITTED TO THE CITY AT THE COMPLETION OF THE PROJECT. <br />CALL BEFORE YOU DIG! <br />Gopher State One Call <br />1/ TWIN CITY AREA: 651-454-0002 <br />'N TOLL FREE: 1-800-252-1166 <br />\A/A UAI IAI/-. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL <br />EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN <br />MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. <br />THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT <br />LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, <br />CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE <br />DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED <br />DURING CONSTRUCTION AT NO COST TO THE OWNER. <br />-N- <br />0 20 40 <br />SCALE IN FEET <br />.. LOUCKS <br />PLANNING <br />CIVIL ENGINEERING <br />LAND SURVEYING <br />LANDSCAPE ARCHITECTURE <br />ENVIRONMENTAL <br />7200 Hemlock Lane, Suite 300 <br />Maple Grove, MN 55369 <br />763.424.5505 <br />www.loucksinc.com <br />CADD files prepared by the Consultant for this project are <br />instruments of the Consultant professional services for use solely <br />with respect to this project. These CADD files shall not be used <br />on other projects, for additions to this project, or for completion <br />of this project by others without written approval by the <br />Consultant. With the Consultant's approval, others may be <br />permitted to obtain copies of the CADD drawing files for <br />information and reference only. All intentional or unintentional <br />revisions, additions, or deletions to these CADD files shall be <br />made at the full risk of that party making such revisions, additions <br />or deletions and that party shall hold harmless and indemnify the <br />Consultant from any & all responsibilities, claims, and liabilities. <br />05-19-21 CITY SUBMITTAL <br />06-14-21 CITY COMMENTS <br />I hereby certify that this plan, specification or report was <br />prepared by me or under my direct supervision and that <br />I am a duly Licensed Professional Engineer under the <br />laws of the State of Minnesota. <br />Jeffrey A. Shopek - PE <br />License No. 19624 <br />Date 06-14-21 <br />Loucks Project No. <br />19767 <br />VV <br />JAS <br />V <br />TRG <br />Checked By <br />V <br />Review Date <br />V <br />C4-1 <br />UTILITY PLAN <br />V <br />DETAIL SHEETS <br />1_1-1 <br />LANDSCAPE PLAN <br />L2-1 <br />LANDSCAPE DETAILS <br />50TW <br />000.6 GW <br />a� <br />d .',e <br />GRADING, DRAINAGE & EROSION CONTROL SPECIFICATIONS <br />1. SPOT ELEVATIONS REPRESENT FINISHED SURFACE GRADES, GUTTER/FLOW LINE, FACE OF BUILDING, <br />OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. <br />2. CATCH BASINS AND MANHOLES IN PAVED AREAS SHALL BE SUMPED 0.04 FEET. ALL CATCH BASINS <br />IN GUTTERS SHALL BE SUMPED 0.10 FEET. RIM ELEVATIONS SHOWN ON PLANS DO NOT REFLECT <br />SUMPED ELEVATIONS. <br />3. ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE MINIMUM OF 4 INCHES OF PREMIUM TOPSOIL <br />AND SEED/MULCH OR SOD. THESE AREAS SHALL BE WATERED/MAINTAINED BY THE CONTRACTOR <br />UNTIL VEGETATION IS ESTABLISHED. VERIFY WITH LANDSCAPE PLAN. <br />4. FOR SITE RETAINING WALLS "TW" EQUALS SURFACE GRADE AT TOP FACE OF WALL (NOT TOP OF <br />WALL), "GW" EQUALS SURFACE GRADE AT BOTTOM FACE OF WALL (NOT BOTTOM OF BURIED <br />WALL COURSES). <br />5. REFER TO THE REPORT OF GEOTECHNICAL EXPLORATION AND REVIEW (REPORT NO.16.61753.100), <br />DATED 12/08/16 AS PREPARED BY NORTHERN TECHNOLOGIES INC. FOR AN EXISTING SUBSURFACE <br />SITE CONDITION ANALYSIS AND CONSTRUCTION RECOMMENDATIONS. <br />6. STREETS MUST BE CLEANED AND SWEPT WHENEVER TRACKING OF SEDIMENTS OCCURS AND <br />BEFORE SITES ARE LEFT IDLE FOR WEEKENDS AND HOLIDAYS, OR AS DIRECTED BY CITY. A REGULAR <br />SWEEPING SCHEDULE MUST BE ESTABLISHED. <br />7. DUST MUST BE ADEQUATELY CONTROLLED. <br />8. SEE SWPPP FOR ADDITIONAL EROSION CONTROL NOTES AND REQUIREMENTS. <br />9. SEE UTILITY PLAN FOR WATER, STORM AND SANITARY SEWER INFORMATION. <br />10. SEE SITE PLAN FOR CURB AND BITUMINOUS TAPER LOCATIONS. <br />11. A STREET SWEEPER MUST BE AVAILABLE WITHIN 3 HOURS UPON NOTICE FROM THE CITY THAT THE <br />STREETS NEED TO BE SWEPT. <br />12. THE CONTRACTOR ALONG WITH THE OWNER SHALL OBTAIN ALL NECESSARY PERMITS AND <br />APPROVALS FROM GOVERNING AUTHORITIES, INCLUDING ANY CITY PERMITS AND THE NPDES <br />PERMIT FROM THE MPCA. <br />13. INSTALL EROSION CONTROL AND TREE PROTECTION MEASURES BEFORE BEGINNING SITE GRADING <br />ACTIVITIES. SOME EROSION CONTROLS SUCH AS BALE CHECKS AND TEMPORARY SILT PONDS MAY <br />BE INSTALLED AS GRADING OCCURS IN SPECIFIC AREAS. MAINTAIN EROSION CONTROLS <br />THROUGHOUT THE GRADING PROCESS AND REMOVE WHEN TURF HAS BEEN ESTABLISHED. <br />14. THE CONTRACTOR SHALL ADHERE TO ALL REQUIREMENTS OF THE MPCA NPDES PERMIT. THE AREA <br />TO BE DISTURBED SHALL BE MINIMIZED AND TURF SHALL BE ESTABLISHED WITHIN THE TIME <br />REQUIRED. <br />15. GRADES SHOWN ARE FINISHED GRADES. <br />16. FINAL GRADING TOLERANCES ARE +/-0.1 FEET TO FINISH GRADES. <br />17. UNDER PAVEMENTS COMPACT THE UPPER 3 FEET OF SUBGRADE TO 100% STANDARD PROCTOR <br />DENSITY AT OPTIMUM MOISTURE CONTENT AND 95% STANDARD PROCTOR DENSITY BLOW THE <br />UPPER 3 FEET OF SUBGRADE. OUTSIDE PAVEMENT AREAS COMPACT EMBANKMENTS TO 95% <br />STANDARD PROCTOR DENSITY. <br />18. WORKING HOURS ARE 7:00 AM - 10:00 PM, MONDAY -SATURDAY. A 48 HOUR NOTICED IS <br />REQUIRED FOR SATURDAY WORK. <br />19. THE CONTRACTOR MUST HAVE A CITY LICENSE. <br />20. A CITY RIGHT-OF-WAY PERMIT IS REQUIRED PRIOR TO WORKING WITHIN CITY ROW. <br />21. TURF REINFORCEMENT MAT (TRM) SHALL BE LANDLOK 450, AS MANUFACTURED BY PROPEX <br />GEOSOLUTIONS, OR APPROVED EQUAL. THE CONTRACTOR SHALL FOLLOW ALL OF THE <br />MANUFACTURERS INSTRUCTIONS FOR INSTALLATION. <br />22. STRUCTURAL RETAINING WALL, FENCING AND HANDRAIL DESIGN BY OTHERS. REFER TO <br />ARCHITECTURAL PLANS. <br />23. REGIONAL POND AND STORM SEWER EAST OF THE SITE MUST BE REVIEWED BY THE CITY AND <br />CONTRACTOR PRIOR TO ANY WORK. THE POND BOTTOM MUST BE VERIFIED WITH SURVEY PRIOR <br />TO ANY WORK, AND ONCE WORK COMMENCES, THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />REMOVING ANY SEDIMENT ADDED TO THE POND OR SEWER DUE TO SITE CONSTRUCTION. CITY <br />TO BE GIVEN 48 HOURS NOTICE BEFORE REVIEW IS WANTED. <br />24. RECORD DRAWINGS MUST BE SUBMITTED TO THE CITY AT THE COMPLETION OF THE PROJECT. <br />CALL BEFORE YOU DIG! <br />Gopher State One Call <br />1/ TWIN CITY AREA: 651-454-0002 <br />'N TOLL FREE: 1-800-252-1166 <br />\A/A UAI IAI/-. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL <br />EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN <br />MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. <br />THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT <br />LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, <br />CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE <br />DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED <br />DURING CONSTRUCTION AT NO COST TO THE OWNER. <br />-N- <br />0 20 40 <br />SCALE IN FEET <br />.. LOUCKS <br />PLANNING <br />CIVIL ENGINEERING <br />LAND SURVEYING <br />LANDSCAPE ARCHITECTURE <br />ENVIRONMENTAL <br />7200 Hemlock Lane, Suite 300 <br />Maple Grove, MN 55369 <br />763.424.5505 <br />www.loucksinc.com <br />CADD files prepared by the Consultant for this project are <br />instruments of the Consultant professional services for use solely <br />with respect to this project. These CADD files shall not be used <br />on other projects, for additions to this project, or for completion <br />of this project by others without written approval by the <br />Consultant. With the Consultant's approval, others may be <br />permitted to obtain copies of the CADD drawing files for <br />information and reference only. All intentional or unintentional <br />revisions, additions, or deletions to these CADD files shall be <br />made at the full risk of that party making such revisions, additions <br />or deletions and that party shall hold harmless and indemnify the <br />Consultant from any & all responsibilities, claims, and liabilities. <br />05-19-21 CITY SUBMITTAL <br />06-14-21 CITY COMMENTS <br />I hereby certify that this plan, specification or report was <br />prepared by me or under my direct supervision and that <br />I am a duly Licensed Professional Engineer under the <br />laws of the State of Minnesota. <br />Jeffrey A. Shopek - PE <br />License No. 19624 <br />Date 06-14-21 <br />Loucks Project No. <br />19767 <br />Project Lead <br />JAS <br />Drawn By <br />TRG <br />Checked By <br />VMA <br />Review Date <br />06-14-21 <br />C1-1 EXISTING CONDITIONS PLAN <br />C1-2 <br />DEMOLITION PLAN <br />C2-1 <br />SITE PLAN <br />C3-1 <br />GRADING & DRAINAGE PLAN <br />C3-2 <br />SWPP PLAN <br />C3-3 <br />SWPP NOTES & DETAILS <br />C4-1 <br />UTILITY PLAN <br />C8-1 <br />DETAIL SHEETS <br />1_1-1 <br />LANDSCAPE PLAN <br />L2-1 <br />LANDSCAPE DETAILS <br />