My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5948
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7499
>
Reso 5900 - 5999 (January 11,2010 - November 8, 2010)
>
Resolution 5948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2015 7:46:52 AM
Creation date
8/7/2015 7:46:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />CITY of ORONO <br />ti <br />RESOLUTION OF THE CITY COUNCIL <br />�`�kEgKO'¢�G NO.` <br />L. Sewer and Water Connection Charges. There are no City of Orono sewer and <br />water connection charges due because the property has been assessed for sewer <br />and water installation. However, the Developer shall be responsible for connection <br />charges imposed on the City of Orono or on the Developer by the City of Wayzata for <br />connection to their systems. MCES Sewer Availability Charges will be collected with <br />the building permit for the property. <br />M. Legal Documents Required. The following list of final submittals must be submitted <br />to the Planning Coordinator four weeks prior to the regularly scheduled Council <br />meeting on the second and fourth Mondays of the month. These submittals are as <br />follows: <br />1) Legal documents required: <br />A. Title opinion addressed to the City or a title insurance policy in favor of <br />the City, All owners, mortgage holders or others with property interest <br />indicated therein shall sign the approval resolution and all other <br />documents affected by such interest. <br />B. The applicant must provide certified copies of all recorded easements <br />currently affecting the property. <br />C. Signed Permanent Flowage and Conservation Easement and Restrictive <br />Covenant for Wetland and Wetland Buffer, <br />D. Signed Road, Drainage and Utility Easement over Outlot A. <br />E. Signed Developers Agreement and Letter of Credit for construction of <br />improvements. The City Engineer shall establish the amount to be <br />provided in the Letter of Credit. <br />F. Construction and Professional Services Escrow in the amount to be <br />determined based on Final Plans. <br />2) Fees to be paid. Total due: $186,000 <br />A. Storm Water & Drainage Trunk Fee = $72,250.00 <br />B. Park Dedication Fee = $143,750.00 <br />Page 10 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.