My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7206
Orono
>
Resolutions
>
Reso 0001-7499
>
Reso 7200 - 7299 (July 12, 2021 - October 10, 2022)
>
Resolution 7206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 7:54:20 AM
Creation date
7/27/2021 3:13:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r,cLeak ._° `, CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> tiF �� NO. 7 2 06 <br /> l'kEsuo0' <br /> 5. Execution of a Development Contract including provision of financial security including a <br /> Letter of Credit and escrow to ensure that all site improvements are installed and <br /> maintained to the City's specifications and satisfaction, and to establish conditions for <br /> future development of the site. <br /> 6. Payment of development fees as follows: <br /> Engineering, City Administration(escrow) $ 10,000.00 <br /> Park Dedication Fee 120,350.00 <br /> Storm Water and Drainage Trunk Fee 31,328.10 <br /> Sewer Connection Charges 199,060.00 <br /> Water Connection Charge 161,690.00 <br /> Final Plat Fee 500.00 <br /> Total Cash Requirements &Fees $512,928.10 <br /> WHEREAS,City staff and consultants have reviewed the plans for this subdivision <br /> and hereby specify approval of each plan and identify them as part of the official record for <br /> ORONO CROSSING, all attached as Exhibit A: <br /> Exhibits A-1 through A-26 including: <br /> A-1: Final Plat Cover Sheet <br /> A-2: Final Plat <br /> A-3: Construction documents cover sheet <br /> A-4: Sheet 2 -Detail sheet <br /> A-5: Sheet 3 -Details <br /> A-6: Alta Survey <br /> A-7: Sheet 5—Site Plan <br /> A-8: Sheet 6—Grading and Drainage <br /> A-9: Sheet 7—Road Profile <br /> A-10: Sheet 8—Erosion and Sediment Control <br /> A-11: Sheet 9—Erosion and Sediment Control details <br /> A-12: Sheet 10—Utility Plan <br /> A-13: Sheet 11 —Utility plan and details <br /> A-14: Sheet 12—Utility plan and details <br /> A-15: Sheet 13—Storm Sewer Plan <br /> A-16: Sheet 14—Street and Storm Sewer plan and details <br /> A-17: Sheet 15— Street and Storm Sewer plan and details <br /> A-18: Sheet 16— Street and Storm Sewer plan and details <br /> A-19: Sheet 17—Filtration Basin details <br /> A-20: Sheet 18—Filtration Basin details <br />
The URL can be used to link to this page
Your browser does not support the video tag.