Laserfiche WebLink
BLOSSOM CIRCLE PARKING AREA <br />0 5 10 20 <br />SCALE IN FEET <br />N <br />8612 <br />CITY OF ORONO RESOLUTA <br />BLOSSOM CIRCLE - CROWN TRANSITION POINT <br />TRANSITION FROM FULL - <br />3% RT–LT CROSS SLOPE OUNTABLE <br />AT END RAD (STA 8+24) SU SURM <br />TO 0% AT HP STA (7+95) <br />I <br />I'I <br />— — — — PED RAMP — 4' SIDEWALK 17 <br />OWN <br />' <br />0% CROWN AT HIGH <br />POINT (STA 7+95) <br />V <br />v <br />TRANSITION FROM <br />SURMOUNTABLE <br />rL'g� <br />TO 8612 C&G <br />STA: 7+95. <br />III <br />xa� <br />TC-1023.16HP I <br />o2?RBTc <br />\ <br />�I <br />TRANSITION FROM <br />SURMOUNTABLE <br />TO 8612 C&G <br />102Y48H <br />O, <br />A\\ <br />I�I <br />STA: 7+95. <br />TC'�1023.16H <br />�/A <br />\\\ <br />• <br />III <br />II' <br />TRANSITION FROM FULL <br />II I <br />3% LT—RT CROSS SLOPE <br />\ <br />III <br />AT END RAD (STA <br />\ <br />7+74) TO 0% AT HIP <br />II I <br />STA (7+95) <br />1022.56TC <br />� <br />II I <br />Oryx <br />W <br />W <br />-J <br />8612 C&G <br />SURMOUNT BLE <br />Of <br />ill <br />V <br />i <br />O <br />o <br />o <br />II' <br />- <br />III <br />� <br />I i <br />I <br />li i <br />BLOSSOM CIRCLE - CROWN TRANSITION POINT <br />I <br />• \ 1�I <br />11 <br />B612 C&IG <br />I III <br />• <br />Q <br />ry �O <br />� LP -1021.42 <br />• <br />oryo99k JC I " I I <br />1 rye' y <br />7 <br />PED RAMP <br />T• 020 5T — <br />1020_5G <br />4' SIDEWALK <br />I <br />• <br />III <br />I I <br />• I Ili <br />— I�I <br />Ill <br />Ill - <br />)N NO. 7206 <br />ALLIANT <br />733 Marquette Avenue <br />Suite 700 <br />Minneapolis, MN 55402 <br />612.758.3080 <br />www.alliant-ine.com <br />David <br />Weekky <br />Hames <br />.do. ---- <br />N <br />O <br />z_ <br />N <br />to <br />O <br />U <br />O <br />z <br />O <br />cc <br />O <br />0 <br />VI <br />W <br />z <br />z <br />0 <br />z <br />0 <br />0 <br />N <br />H <br />z <br />W <br />U <br />O <br />0 <br />z <br />O <br />H <br />U <br />cc <br />t— <br />N <br />z <br />O <br />U <br />U) <br />J <br />H <br />W <br />0 <br />z <br />O <br />H <br />U <br />W <br />to <br />cc <br />W <br />F– <br />z <br />H <br />W <br />W <br />IM <br />F- <br />U) N <br />I hereby certify that this plan, <br />specification, or report was <br />prepared by me or undermy <br />direct supervision and that I <br />am a duly Licensed <br />PROFESSIONAL ENGINEER under <br />the laws of the State of <br />MINNESOTA <br />MARK RAUS/ CHVPE <br />6-3-2021 43480 <br />Dote License No. <br />QUALITY ASSURANCE/CONTROL <br />BY DATE <br />DATE ISSUE <br />1-20-2021 CITY SUBMITTAL - PRELIM PLAT <br />4-21-2021 CITY SUBMITTAL <br />6-3-2021 CONSTRUCTION DOCUMENTS <br />PROJECT TEAM DATA <br />DESIGNED: MPR <br />DRAWN: TAS <br />PROJECT NO: 220-0101 <br />20 <br />SHEET 20 OF 23 <br />