My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7206
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 7200 - 7299 (July 12, 2021 - October 10, 2022)
>
Resolution 7206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 7:54:20 AM
Creation date
7/27/2021 3:13:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GRADING LEGEND: <br />o v02019 <br />_ BWI"1 ., o <br />H _ _ TW 9'0221,0 <br />-_BW 9020.0 <br />yC, <br />3 N � <br />EXISTING POND \10 8•na `o <br />NWL=1009.0 <br />HWL=1013.0 1 \ <br />(PER DESIGN PLAN) TW 040. <br />BW 1016.0 <br />TW 1020.9 �.. .� <br />BW 1017.5 <br />3.5'X8' - 28 SF OF TRM <br />707 <br />Ou �nu <br />SEE SHEET 17 FOR <br />BASIN CROSS SECTION <br />1A p <br />/ <br />SEE SHEET 17 FOR <br />BASIN CROSS SECTION <br />0 <br />X \ <br />/ BLOICK 4 <br />REAR 1023.8 <br />FFE 1024.47 <br />�00� 3a 1----�- 3 <br />w� \p2A 3 GFE 1023 8 <br />i u � <br />W <br />�x 10ti0' ZOA <br />22.60HP < < -_�- <br />TRANSITION FROM FULL <br />3% LT -RT CROSS <br />SLOPE AT END RAD <br />(STA 7+74) TO 0% AT <br />HP (STA 7+95) <br />V <br />N <br />--Orn- 75 <br />Y ON N <br />(J 0 0 <br />m <br />O aw <br />On <br />L CD <br />-US N <br />BLOCK � J '8 BLOCK 7 BLOCK 6 <br />LL REAR 1023.2 REAR 1022.9 REAR 1023.0 <br />FFE 1023.87 FFE 1023.57 FFE 1023.67 <br />1 L 2 3 4 5 1 2 3 4 1 2 3 4 <br />GFE 102 .5 220 GFE 1022.9 GFE 1023.0 <br />I °ti (+1) +0 (+1) (+1) (+1) <br />4 <br />111110 <br />'TRANSITION FROM FULL 3% <br />II RT -LT CROSS SLOPE AT <br />END RAD (STA 8+24) TO <br />0% AT HP (STA 7+95) <br />II / <br />702'' 1 <br />F1i d <br />I <br />0% CROWN AT HIGH <br />POINT (STA 7+95) <br />Liz O <br />II 01� <br />56 C 0 V <br />EG -7023 <br />/ <br />�II <br />I <br />_IIs I <br />I I <br />II eC�70 <br />--- PROPOSED FRONT SIDEWALK <br />z <br />FlL7&�TIQNii3 <br />117 <br />PROPOSED LOT LINE <br />GRADING PAD, SEE DETAIL <br />PROPOSED BUILDING FOOTPRINT <br />REAR PAD ELEVATION <br />Z <br />a- <br />MIFINIS11DFLOOR ELEVATION <br />GARAGE FLOOR ELEVATION (AT DOOR) <br />ADDITIONAL GARAGE STEPS <br />1621.39--GUT-E <br />DRIVEWAY SLOPE <br />- - -912 - - - EXISTING CONTOUR <br />-� <br />_-'- <br />_-- <br />1018 _ <br />tea-•- _ <br />- 912 - PROPOSED CONTOUR <br />_ <br />_1 � 101 ,C1 <br />- - <br />X017' 1"1. _ _._._ <br />EG' '_ <br />- <br />x12.44 x912.44 PROPOSED SPOT ELEVATION <br />P TW-1020CQ <br />102 -$W -T020.0 <br />_ G <br />-bu- <br />4--1-028?J- <br />■ 0 PROPOSED CATCH BASINS <br />_leis-_ - <br />1 <br />B 1017.5 ----------Tees- <br />- <br />> PROPOSED STORM SEWER <br />i <br />--' <br />direct sup-ision and that I <br />am a duly Licensed <br />- - - - - - - PROPOSED EASEMENT <br />the laws of the Slate of <br />MINNESOTA <br />PROPERTY LINE <br />CHVPE <br />MARK RAUS/ <br />SETBACK LINE <br />43480 <br />Dote License No. <br />QUALITY ASSURANCE/CONTROL <br />BY DATE <br />LOT LINE <br />DATE ISSUE <br />1-20-2021 CITY SUBMITTAL - <br />PRELIM PLAT <br />- - - RIGHT-OF-WAY <br />6-3-2021 CONSTRUCTION DOCUMENTS <br />TW 15.0 TOP OF WALL ELEVATION <br />BW 11.0 BOTTOM OF WALL ELEVATION <br />a�5 <br />DIRECTION OF DRAINAGE/SLOPE <br />�e <br />PROJECT TEAM DATA <br />DESIGNED: <br />EMERGENCY OVERFLOW ROUTING <br />DRAWN: <br />TAS <br />\ <br />v RETAINING WALL <br />REMOVE RETAINING WALL <br />v <br />I <br />a <br />V <br />17 <br />i SEE SHEET <br />;; BASIN CROSS <br />17 FOR <br />SECTION <br />1 <br />� ,5 <br />N <br />O <br />�ti I <br />4 <br />�P <br />T� <br />ANY <br />_ - I E4027.13'( <br />Atrot <br />L <br />EG_1 <br />S <br />27, <br />i <br />TS 102.-- <br />` <br />102 5. <br />�✓j,N//`x <br />2 SETS (4 STEPS) •8GH 1026 ' % <br />i <br />EACH, 7.5" RISERS, <br />12' TREAD W/ - - - <br />- '-' 1024 <br />N <br />ry� <br />RAILING <br />- ----� 1022 � <br />\l <br />BS 1021 <br />o v02019 <br />_ BWI"1 ., o <br />H _ _ TW 9'0221,0 <br />-_BW 9020.0 <br />yC, <br />3 N � <br />EXISTING POND \10 8•na `o <br />NWL=1009.0 <br />HWL=1013.0 1 \ <br />(PER DESIGN PLAN) TW 040. <br />BW 1016.0 <br />TW 1020.9 �.. .� <br />BW 1017.5 <br />3.5'X8' - 28 SF OF TRM <br />707 <br />Ou �nu <br />SEE SHEET 17 FOR <br />BASIN CROSS SECTION <br />1A p <br />/ <br />SEE SHEET 17 FOR <br />BASIN CROSS SECTION <br />0 <br />X \ <br />/ BLOICK 4 <br />REAR 1023.8 <br />FFE 1024.47 <br />�00� 3a 1----�- 3 <br />w� \p2A 3 GFE 1023 8 <br />i u � <br />W <br />�x 10ti0' ZOA <br />22.60HP < < -_�- <br />TRANSITION FROM FULL <br />3% LT -RT CROSS <br />SLOPE AT END RAD <br />(STA 7+74) TO 0% AT <br />HP (STA 7+95) <br />V <br />N <br />--Orn- 75 <br />Y ON N <br />(J 0 0 <br />m <br />O aw <br />On <br />L CD <br />-US N <br />BLOCK � J '8 BLOCK 7 BLOCK 6 <br />LL REAR 1023.2 REAR 1022.9 REAR 1023.0 <br />FFE 1023.87 FFE 1023.57 FFE 1023.67 <br />1 L 2 3 4 5 1 2 3 4 1 2 3 4 <br />GFE 102 .5 220 GFE 1022.9 GFE 1023.0 <br />I °ti (+1) +0 (+1) (+1) (+1) <br />4 <br />111110 <br />'TRANSITION FROM FULL 3% <br />II RT -LT CROSS SLOPE AT <br />END RAD (STA 8+24) TO <br />0% AT HP (STA 7+95) <br />II / <br />702'' 1 <br />F1i d <br />I <br />0% CROWN AT HIGH <br />POINT (STA 7+95) <br />Liz O <br />II 01� <br />56 C 0 V <br />EG -7023 <br />/ <br />�II <br />I <br />_IIs I <br />I I <br />II eC�70 <br />-------------Ooze---/ <br />- " W YZATA BLVD. WEST (COUNTY HIGHWAY NO. 112) <br />(PUBLIC R.O.W.) <br />CITY OF ORONO RESOLUTI( <br />GRADING NOTES: <br />1. ALL FINISHED GRADES SHALL SLOPE AWAY FROM PROPOSED BUILDINGS AT MINIMUM GRADE <br />OF 2.00%. ALL SWALES SHALL HAVE A MINIMUM SLOPE OF 2.00%. <br />2. THE CONTRACTOR SHALL KEEP THE ADJACENT ROADWAYS FREE OF DEBRIS AND PREVENT <br />THE OFF-SITE TRACKING OF SOIL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CIN <br />OF ORONO AND MINNEHAHA CREEK WATERSHED DISTRICT. <br />3. NOTIFY GOPHER STATE ONE CALL, AT (800)252-1166, 48 HOURS PRIOR TO START OF <br />CONSTRUCTION. <br />4. ALL IMPROVEMENTS TO CONFORM WITH CITY OF ORONO CONSTRUCTION DETAILS, LATEST <br />EDITION. <br />5. REFER TO GEOTECHNICAL REPORT AND PROJECT MANUAL, FOR SOIL CORRECTION <br />REQUIREMENTS AND TESTING REQUIREMENTS. <br />6. STRIP TOPSOIL PRIOR TO ANY CONSTRUCTION. REUSE STOCKPILE ON SITE, STOCKPILE <br />PERIMETERS MUST BE PROTECTED WITH SILT FENCE. <br />7. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE TO MAKE <br />SURE THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED. NO <br />CONSTRUCTION OR FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED <br />AND THOROUGHLY REVIEWED ALL PLANS AND OTHER DOCUMENTS APPROVED BY ALL OF <br />THE PERMITTING AUTHORITIES. <br />B. IMMEDIATELY FOLLOWING GRADING OF (3:1 OR GREATER) SIDE SLOPES AND DRAINAGE <br />SWALES, WOOD FIBER BLANKET OR OTHER APPROVED SOIL STABIL17ING METHOD (APPROVED <br />BY ENGINEER) SHALL BE APPLIED OVER APPROVED SEED MIXTURE AND A MINIMUM OF 6" <br />TOPSOIL. <br />9. THE GENERAL CONTRACTOR MUST DISCUSS DEWATERING PLANS WITH ALL SUBCONTRACTORS <br />TO VERIFY NPDES REQUIREMENTS. IF DEWATERING IS REQUIRED DURING CONSTRUCTION, <br />CONTRACTOR SHOULD CONSULT WITH EROSION CONTROL INSPECTOR AND ENGINEER TO <br />DETERMINE APPROPRIATE METHOD. <br />10. REFER TO STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR ALL EROSION AND <br />SEDIMENT CONTROL DEVICE LOCATION, DESCRIPTIONS, NOTES AND DETAILS INCLUDING <br />CONCRETE WASHOUT STATION INSTRUCTIONS. <br />11. STEPS WILL BE REQUIRED IN SIDEWALKS LEADING TO FRONT OF UNITS. FINAL GRADING <br />PLANS TO PROVIDE DETAILS ON SIDEWALKS REQUIRING STEPS. SEE CALCULATIONS ON <br />SHEET 7. <br />12. PERIMETER EROSION CONTROL MEASURED MUST BE INSTALLED BY THE CONTRACTOR AND <br />INSPECTED BY THE CITY PRIOR TO ANY OTHER WORK. CONTRACTOR MUST PROVIDE MINIMUM <br />24-HOUR NOTICE PRIOR TO INSPECTION. <br />13. THE CONDITION OF THE REGIONAL POND WEST ROT HE SITE MUST BE REVIEWEDD BY THE <br />CITY AND CONTRACTOR PRIOR TO ANY WORK. THE POND BOTTOM MUST BE VERIFIED WITH <br />SURVEY PRIOR TOANY WORK. ONCE WORK COMMENCES, THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR REMOVING AND SEDIMENT ADDED TO THE POND DUE TO SITE <br />CONSTRUCTION <br />RETAINING WALL NOTES: <br />RETAINING WALL MASS GRADING PREPARATION <br />1. ALL RETAINING WALLS SHALL BE ROUGH GRADED AT A 2:1 SLOPE <br />WITH BASE OF SLOPE AT PROPOSED WALL FACE. <br />2. THE RETAINING WALL SLOPE AREAS ARE TO BE MAINTAINED UNTIL <br />RETAINING WALL CONSTRUCTION OCCURS. ANY EROSION SHALL BE <br />REMEDIED AND RESTORED. <br />3. BUILDING PERMITS ARE REQUIRED FOR ALL RETAINING WALLS 4 FEET <br />IN HEIGHT OR GREATER AND THE WALLS SHALL BE DESIGNED BY A <br />STRUCTURAL ENGINEER WITH DESIGN REVIEWED AND APPROVED BY <br />THE CITY PRIOR TO INSTALLATION. ANY QUESTIONS REGARDING THE <br />BUILDING PERMITS SHALL BE DIRECTED TO THE CITY BUILDING <br />INSPECTOR. <br />4. INSTALL SAFETY RAILING ATOP ALL WALLS WHERE REQUIRED BY CODE. <br />5. RETAINING WALL CONTRACTOR AND/OR RETAINING WALL STRUCTURAL <br />ENGINEER ARE RESPONSIBLE TO REVIEW CIVIL SITE ENGINEERING <br />DRAWINGS. ANY OBSERVED CONCERNS WITH CIVIL SITE ENGINEERING <br />DESIGN ELEMENTS RELATED TO RETAINING WALLS THAT REQUIRE <br />MODIFICATIONS TO THE CIVIL SITE DESIGN IS THEIR RESPONSIBILITY TO <br />COORDINATE WITH PROJECT OWNER AND CIVIL SITE ENGINEER. IF NO <br />COORDINATION IS REQUESTED IT SHALL BE UNDERSTOOD THAT ALL <br />CONDITIONS WITHIN THE CIVIL SITE DESIGN AND PLANS ARE <br />ACCEPTABLE AND ABLE TO BE PROVIDED FOR IN THE RETAINING WALL <br />DESIGN AND CONSTRUCTION. <br />6. RETAINING WALLS REQUIRING ENGINEERING ARE TO BE FINAL DESIGNED <br />AND PERMITTED BY OTHERS. <br />NOTE: <br />EMERGENCY OVERFLOW FREEBOARD CRITERIA: THE LOWEST FLOOR <br />ELEVATION OF ANY NEW BUILDING SHALL BE PLACED AT LEAST 1.5 FEET <br />ABOVE EMERGENCY OVERFLOW ELEVATIONS. <br />PAD WIDTHS =3 UNIT = 66' <br />4 UNIT = 88' <br />5 UNIT = 110' <br />A= GROSS H.D. 1.5' <br />B- TOPSOIL RESPREAD 0.5' <br />C= NETH.D. 1.0' <br />D_ PAD DEPTH 4 3 UNITT 3' = 5 53' <br />UNI <br />5 UNIT = 53' <br />E BUILDING SETBACK 20 MIN FROM BACK OF CURB (TYPICAL) <br />F OVERSIZING 5 -ALL SIDES <br />MASS GRADE LOT <br />SLAB ON GRADE To DRAIN To <br />ALL NOT TO WANUMBERS INLE E%TENT POSSIBLE <br />HOLD DOWN DETAILS <br />N <br />0 15 30 60 <br />SCALE IN FEET <br />7206 <br />ALLIANT <br />733 Marquette Avenue <br />Suite 700 <br />Minneapolis, MN 55402 <br />612.758.3080 <br />www.alliant-ine.com <br />David <br />Weekky <br />Hames <br />z <br />FlL7&�TIQNii3 <br />Z <br />a- <br />LJCJ <br />1621.39--GUT-E <br />- <br />-� <br />_-'- <br />_-- <br />1018 _ <br />tea-•- _ <br />102 <br />_ <br />_1 � 101 ,C1 <br />- - <br />X017' 1"1. _ _._._ <br />EG' '_ <br />- <br />uu <br />« , . <br />P TW-1020CQ <br />102 -$W -T020.0 <br />_ G <br />-bu- <br />4--1-028?J- <br />--, <br />1016.0 <br />_leis-_ - <br />1 <br />B 1017.5 ----------Tees- <br />- <br />------------------------ ------ <br />i <br />--' <br />-------------Ooze---/ <br />- " W YZATA BLVD. WEST (COUNTY HIGHWAY NO. 112) <br />(PUBLIC R.O.W.) <br />CITY OF ORONO RESOLUTI( <br />GRADING NOTES: <br />1. ALL FINISHED GRADES SHALL SLOPE AWAY FROM PROPOSED BUILDINGS AT MINIMUM GRADE <br />OF 2.00%. ALL SWALES SHALL HAVE A MINIMUM SLOPE OF 2.00%. <br />2. THE CONTRACTOR SHALL KEEP THE ADJACENT ROADWAYS FREE OF DEBRIS AND PREVENT <br />THE OFF-SITE TRACKING OF SOIL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CIN <br />OF ORONO AND MINNEHAHA CREEK WATERSHED DISTRICT. <br />3. NOTIFY GOPHER STATE ONE CALL, AT (800)252-1166, 48 HOURS PRIOR TO START OF <br />CONSTRUCTION. <br />4. ALL IMPROVEMENTS TO CONFORM WITH CITY OF ORONO CONSTRUCTION DETAILS, LATEST <br />EDITION. <br />5. REFER TO GEOTECHNICAL REPORT AND PROJECT MANUAL, FOR SOIL CORRECTION <br />REQUIREMENTS AND TESTING REQUIREMENTS. <br />6. STRIP TOPSOIL PRIOR TO ANY CONSTRUCTION. REUSE STOCKPILE ON SITE, STOCKPILE <br />PERIMETERS MUST BE PROTECTED WITH SILT FENCE. <br />7. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE TO MAKE <br />SURE THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED. NO <br />CONSTRUCTION OR FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED <br />AND THOROUGHLY REVIEWED ALL PLANS AND OTHER DOCUMENTS APPROVED BY ALL OF <br />THE PERMITTING AUTHORITIES. <br />B. IMMEDIATELY FOLLOWING GRADING OF (3:1 OR GREATER) SIDE SLOPES AND DRAINAGE <br />SWALES, WOOD FIBER BLANKET OR OTHER APPROVED SOIL STABIL17ING METHOD (APPROVED <br />BY ENGINEER) SHALL BE APPLIED OVER APPROVED SEED MIXTURE AND A MINIMUM OF 6" <br />TOPSOIL. <br />9. THE GENERAL CONTRACTOR MUST DISCUSS DEWATERING PLANS WITH ALL SUBCONTRACTORS <br />TO VERIFY NPDES REQUIREMENTS. IF DEWATERING IS REQUIRED DURING CONSTRUCTION, <br />CONTRACTOR SHOULD CONSULT WITH EROSION CONTROL INSPECTOR AND ENGINEER TO <br />DETERMINE APPROPRIATE METHOD. <br />10. REFER TO STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR ALL EROSION AND <br />SEDIMENT CONTROL DEVICE LOCATION, DESCRIPTIONS, NOTES AND DETAILS INCLUDING <br />CONCRETE WASHOUT STATION INSTRUCTIONS. <br />11. STEPS WILL BE REQUIRED IN SIDEWALKS LEADING TO FRONT OF UNITS. FINAL GRADING <br />PLANS TO PROVIDE DETAILS ON SIDEWALKS REQUIRING STEPS. SEE CALCULATIONS ON <br />SHEET 7. <br />12. PERIMETER EROSION CONTROL MEASURED MUST BE INSTALLED BY THE CONTRACTOR AND <br />INSPECTED BY THE CITY PRIOR TO ANY OTHER WORK. CONTRACTOR MUST PROVIDE MINIMUM <br />24-HOUR NOTICE PRIOR TO INSPECTION. <br />13. THE CONDITION OF THE REGIONAL POND WEST ROT HE SITE MUST BE REVIEWEDD BY THE <br />CITY AND CONTRACTOR PRIOR TO ANY WORK. THE POND BOTTOM MUST BE VERIFIED WITH <br />SURVEY PRIOR TOANY WORK. ONCE WORK COMMENCES, THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR REMOVING AND SEDIMENT ADDED TO THE POND DUE TO SITE <br />CONSTRUCTION <br />RETAINING WALL NOTES: <br />RETAINING WALL MASS GRADING PREPARATION <br />1. ALL RETAINING WALLS SHALL BE ROUGH GRADED AT A 2:1 SLOPE <br />WITH BASE OF SLOPE AT PROPOSED WALL FACE. <br />2. THE RETAINING WALL SLOPE AREAS ARE TO BE MAINTAINED UNTIL <br />RETAINING WALL CONSTRUCTION OCCURS. ANY EROSION SHALL BE <br />REMEDIED AND RESTORED. <br />3. BUILDING PERMITS ARE REQUIRED FOR ALL RETAINING WALLS 4 FEET <br />IN HEIGHT OR GREATER AND THE WALLS SHALL BE DESIGNED BY A <br />STRUCTURAL ENGINEER WITH DESIGN REVIEWED AND APPROVED BY <br />THE CITY PRIOR TO INSTALLATION. ANY QUESTIONS REGARDING THE <br />BUILDING PERMITS SHALL BE DIRECTED TO THE CITY BUILDING <br />INSPECTOR. <br />4. INSTALL SAFETY RAILING ATOP ALL WALLS WHERE REQUIRED BY CODE. <br />5. RETAINING WALL CONTRACTOR AND/OR RETAINING WALL STRUCTURAL <br />ENGINEER ARE RESPONSIBLE TO REVIEW CIVIL SITE ENGINEERING <br />DRAWINGS. ANY OBSERVED CONCERNS WITH CIVIL SITE ENGINEERING <br />DESIGN ELEMENTS RELATED TO RETAINING WALLS THAT REQUIRE <br />MODIFICATIONS TO THE CIVIL SITE DESIGN IS THEIR RESPONSIBILITY TO <br />COORDINATE WITH PROJECT OWNER AND CIVIL SITE ENGINEER. IF NO <br />COORDINATION IS REQUESTED IT SHALL BE UNDERSTOOD THAT ALL <br />CONDITIONS WITHIN THE CIVIL SITE DESIGN AND PLANS ARE <br />ACCEPTABLE AND ABLE TO BE PROVIDED FOR IN THE RETAINING WALL <br />DESIGN AND CONSTRUCTION. <br />6. RETAINING WALLS REQUIRING ENGINEERING ARE TO BE FINAL DESIGNED <br />AND PERMITTED BY OTHERS. <br />NOTE: <br />EMERGENCY OVERFLOW FREEBOARD CRITERIA: THE LOWEST FLOOR <br />ELEVATION OF ANY NEW BUILDING SHALL BE PLACED AT LEAST 1.5 FEET <br />ABOVE EMERGENCY OVERFLOW ELEVATIONS. <br />PAD WIDTHS =3 UNIT = 66' <br />4 UNIT = 88' <br />5 UNIT = 110' <br />A= GROSS H.D. 1.5' <br />B- TOPSOIL RESPREAD 0.5' <br />C= NETH.D. 1.0' <br />D_ PAD DEPTH 4 3 UNITT 3' = 5 53' <br />UNI <br />5 UNIT = 53' <br />E BUILDING SETBACK 20 MIN FROM BACK OF CURB (TYPICAL) <br />F OVERSIZING 5 -ALL SIDES <br />MASS GRADE LOT <br />SLAB ON GRADE To DRAIN To <br />ALL NOT TO WANUMBERS INLE E%TENT POSSIBLE <br />HOLD DOWN DETAILS <br />N <br />0 15 30 60 <br />SCALE IN FEET <br />7206 <br />ALLIANT <br />733 Marquette Avenue <br />Suite 700 <br />Minneapolis, MN 55402 <br />612.758.3080 <br />www.alliant-ine.com <br />David <br />Weekky <br />Hames <br />6 <br />SHEET 6OF 23 <br />z <br />Z <br />a- <br />LJCJ <br />LU <br />O <br />Z <br />C <br />U <br />0 <br />z <br />° <br />Z <br />cc <br />o <br />0 <br />° On <br />N <br />U Z <br />O <br />a <br />(� <br />z <br />z <br />O <br />N <br />o <br />x o <br />O <br />O o <br />U <br />(7 <br />I hereby certify that this plan, <br />specification, or report was <br />prepared by me ounder <br />my <br />direct sup-ision and that I <br />am a duly Licensed <br />PROFESSIONAL ENGINEER under <br />the laws of the Slate of <br />MINNESOTA <br />CHVPE <br />MARK RAUS/ <br />6-3-2021 <br />43480 <br />Dote License No. <br />QUALITY ASSURANCE/CONTROL <br />BY DATE <br />DATE ISSUE <br />1-20-2021 CITY SUBMITTAL - <br />PRELIM PLAT <br />4-21-2021 CITY SUBMITTAL <br />6-3-2021 CONSTRUCTION DOCUMENTS <br />PROJECT TEAM DATA <br />DESIGNED: <br />MPR <br />DRAWN: <br />TAS <br />PROJECT NO: 220-0101 <br />6 <br />SHEET 6OF 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.