Laserfiche WebLink
8. Retaining walls 4'or greater in height must be designed by a licensed Professional Engineer. Wall • <br /> plans must be submitted for review prior to construction. <br /> a. Retaining walls over 4 ft in height will be designed by a professional engineer during construction plan <br /> preparation. <br /> 9. Fencing must be provided on walls 4'or greater in height. Fencing must be indicated on the plans <br /> and details included accordingly. <br /> a. Fencing will be provided on top of walls to match existing black wrought iron fence along north side. See <br /> Architectural for detail. <br /> 10. Gate valves must be provided at or near proposed connection points to the existing system. The <br /> eastern connection must be adjusted so it is not directly under curb or in conflict with the storm <br /> sewer. <br /> a. Gate valves have been added and the rerouting has been adjusted so it is not under the curb or storm sewer. <br /> 11. Due to the inaccessible location of CBMH-18 and manhole depth,the applicant should consider <br /> removing the sump. <br /> a. Sump has been removed. <br /> 12. A Prairie Rose Crabapple near the entrance is indicated over the watermain. This tree location <br /> must be adjusted to remove the conflict. The Prairie Rose Crabapple has been relocated. <br /> 13. The Stormwater Pollution Prevention Plans shall be revised as outlined in the attached SWPPP <br /> Review Checklist. Following are the general items that must be addressed: a. Identify persons <br /> responsible for inspections and BMP maintenance.A contractor has not been selected yet, when the project <br /> moves forward and a contractor is selected, their responsible person will be listed for maintenance and inspections. <br /> b. Provide map of surface waters,impaired waters within 1 mile. The map has been added,as well as a <br /> list of water bodies. <br /> c. Provide training certifications.Designer cert fcate has been added to the sheet C3-3, a copy of other <br /> certificates will be stored with the SWPPP as contractors are selected • <br /> 14. Record drawings must be submitted upon completion of the project. <br /> a. Noted <br /> S <br /> Page 2 <br />