My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-17-2021 Planning Commission Packet
Orono
>
Planning Commission
>
2021
>
05-17-2021 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2021 8:48:52 AM
Creation date
5/18/2021 8:35:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PC Exhibit D <br /> LA21-34 <br /> • <br /> ;/ CITY OF ORONO <br /> Street Address: Mailing Address: Telephone(952)249-4600 <br /> ` 2750 Kelley Parkway P.O.Box 66 Fax (952)249-4616 <br /> l q�. �t.L/ Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us <br /> S ti <br /> April 30, 2021 <br /> Charles Schatz VIA EMAIL <br /> 12400 Portland Ave S#100 cschatz@reprisedesign.com <br /> Burnsville, MN 55337 <br /> Re: Concept Plan @ 3423 Shoreline <br /> File#LA21-000034 <br /> Mr.Schatz, <br /> I has received and completed a preliminary review of your proposed concept plan for a proposed building at 3423 <br /> Shoreline Drive. I have the following comments to offer as we prepare for a Planning Commission review of your <br /> project. I have tried to be as thorough as possible, but note that additional comments may be generated as review <br /> continues. If you would like to supplement your application,or make any changes to the plan,these should be provided <br /> no later than May 10, 2021. I intend to place this on the Planning Commissions agenda for May 17, 2021. <br /> • 1. Process. The City does not review conceptual conditional use permits or site plan proposals. We do have a process <br /> for a sketch plan,which allows for the review of a potential subdivision. This project will be processed as a sketch plan. <br /> Subdividing the property will involve a preliminary plat and a final plat. Given the nature of the project,and no apparent <br /> public improvements, I can support these two reviews occurring concurrently. The preliminary plat will require a public <br /> hearing. <br /> The building will require a conditional use permit. This will require a public hearing,also. The public hearings can occur <br /> at the same time, or separately. <br /> 2. Plat/subdivision. <br /> a. Please confirm that the new lot is at least 20,000 sq ft and has 100 feet of width at the Shoreline Drive. <br /> Also,we will need to confirm that the remaining parcel: <br /> b. Has no more than 20%structural coverage and 30%impervious surface area. <br /> c. Retains at least 15 foot side yard setback(to the east). <br /> 3. Hardcover. The city code limits the site to 30% coverage of pervious surfaces. The portion of the lower driveway <br /> that serves the commercial buildings to the west can be excluded from the hardcover limits. <br /> 4.Structural coverage. The city code limits structural coverage to 20%of the lot area. <br /> 5. Stormwater management. Confirmation of permit requirements from the Minnehaha Creek Watershed district will <br /> be necessary. It is expected that stormwater leaving the site cannot exceed predevelopment levels of rate, volume, <br /> and phosphorus. <br /> 6.Access. The County will need to approve access location. <br /> • a.A cross access and parking easement will be required over at least the shared drive aisles and parking spaces <br /> east of the existing liquor store. <br /> 7. Parking/loading. I appreciate the parking study completed and submitted. I do have some comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.