My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-26-2021 Septic Compliance Inspection
Orono
>
Property Files
>
Street Address
>
G
>
Graham Hill Road
>
3375 Graham Hill Road - 05-117-23-11-0018
>
Septic
>
04-26-2021 Septic Compliance Inspection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:15:46 PM
Creation date
4/28/2021 11:15:22 AM
Metadata
Fields
Template:
x Address Old
House Number
3375
Street Name
Graham Hill
Street Type
Road
Address
3375 Graham Hill Rd
Document Type
Septic
PIN
0511723110018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Other compliance conditions — Compliance component #3 of 5 <br />3a. Maintenance hole covers appear to be structurally unsound (damaged, cracked, etc.), or unsecured? <br />❑ Yes' ® No ❑ Unknown <br />3b. Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety? ❑ Yes* ® No ❑ Unknown <br />*Yes to 3a or 3b - System is an imminent threat to public health and safety. <br />3c. System is non -protective of ground water for other conditions as determined by inspector? ❑ Yes' ® No <br />3d. System not abandoned in accordance with Minn. R. 7080.2500? ❑ Yes- ® No <br />*Yes to 3c or 3d - System is failing to protect groundwater. <br />Describe verification methods and results: <br />Attached supporting documentation: ❑ Not applicable ❑ <br />4. Operating permit and nitrogen BMP* —Compliance component #4 of 5 ® Not applicable <br />Is the system operated under an Operating Permit? ❑ Yes ❑ No If "yes", A below is required <br />Is the system required to employ a Nitrogen BMP specified in the system design? ❑ Yes ❑ No If "yes", B below is required <br />BMP = Best Management Practice(s) specified in the system design <br />if the answer to both questions is "no", this section does not need to be completed. <br />Compliance criteria: <br />a. Have the operating permit requirements been met? ❑ Yes ❑ No <br />b. Is the required nitrogen BMP in place and properly functioning? ❑ Yes ❑ No <br />Any "no" answer indicates noncompliance. <br />Describe verification methods and results: <br />Attached supporting documentation: ❑ Operating permit (Attach) ❑ <br />hnps://www.pca.state.mn.us 651-296-6300 800-657-3864 Use your preferred relay service Available in alternative formats <br />wq-wwists4-31b • 1/11/21 Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.