Laserfiche WebLink
Task 4 52749 Date Called in 031311/2021 <br />Date Scheduled 04/05/2021 <br />City Of Orono <br />Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form j�(1 <br />Property Address: <br />3422 Livingston Ave. <br />PID: <br />1711723 30022 <br />Owner Information <br />Name: <br />—Michael Rosdahl <br />Mailing Address: <br />(if different from <br />Property) <br />Fail <br />Phone: <br />763-478-1736 Email: I michaelrosdahl@icloud.com <br />Inspector Information <br />Name: <br />Company/ Organization License number: <br />Phone: Email: <br />Inspection <br />System <br />Standard <br />Pass <br />Fail <br />Roof Drains <br />Roof drains and leaders Roof drains should not be connected to the sanitary <br />Name: <br />sewer but should discharge to the ground outside of a building. If the roof <br />drains are connected to the sanitary sewer, disconnect them, plug any open <br />connections to the sanitary sewer using a non -shrink permanent material, and <br />redirect the roof drains onto the ground outside the building. <br />Foundation <br />Foundation drains are underground pipes that collect storni water from <br />Drains <br />around the base of a building and into a sump basket, where it is then <br />pumped outside of the building. Foundation drains should not be connected <br />to the sanitary sewer. <br />Sump Pumps <br />Sump pumps are designed to capture surface or ground water that enters <br />basements or crawl spaces and pump it away from the house. The basic sump <br />system includes drain tile, a sump pit, a sump pump, a float or switch, and a <br />drain line. Sump pumps should not be connected to the sanitary sewer. <br />Sewer Service <br />Sanitary Sewer Inflow & Infiltration (1/1) Compliance Inspection Sanitary <br />Line <br />Sewer Lines. All sanitary sewer lines serving Property, from the house to the <br />main line, shall be in a safe and functional condition and shall be free from all <br />leaks, failures including but not limited to partially collapsed sections or tree <br />root intrusion. The sanitary sewer lines shall meet the City Code standards and <br />specifications.(Details on back of this sheet) <br />Notes: <br />Inspectors Signature: ( COT, I Date: q_ <br />Owners signature: I I Date: <br />City Review <br />jX Com liant <br />I W Corrective Action Required <br />Certificate of Compliance Expires: - <br />Corrective Action Due by: <br />Date: {J , <br />Signature: <br />Name: <br />V <br />Service Line Inspection Details <br />