My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-11-2021 Council Work Session Packet
Orono
>
City Council
>
2021
>
01-11-2021 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2021 10:43:43 AM
Creation date
4/15/2021 10:40:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFT Comprehensive Fire Service Study MEDINA, MINNESOTA <br /> <br />Matrix Consulting Group Page 49 <br />As illustrated, ISO does not specify the number of personnel that is expected or <br />anticipated to arrive and instead provides points for the personnel - meaning the more <br />on-duty personnel the more points are added to the overall evaluation. In comparison, <br />NFPA 1720 addresses the number of personnel based on the demographics with less <br />personnel in rural areas than urban or suburban. NFPA 1710 and CPSE base their <br />personnel requirements on creating an effective response force using critical tasking. <br /> <br />2. Effective Response Force <br />There are several tasks, which must occur simultaneously to adequately combat different <br />types of fires. The absence of adequate personnel to perform these tasks requires each <br />task to be prioritized and completed in chronological order. These fire ground tasks <br />include command, scene safety, search and rescue, water supply, fire attack, pump <br />operations, ventilation, back up and rapid intervention. <br /> <br />An initial full alarm assignment should be able to provide personnel to accomplish the <br />following tasks: <br /> <br />• Establish incident command outside of the hazard area. This will allow coordination <br />and direction of the incoming emergency response personnel and apparatus. A <br />minimum of one person should be dedicated to this task. <br /> <br />• Establish an uninterrupted water supply of at least 400 gallons per minute for 30 <br />minutes. Once established the supply line can be maintained by the pump operator to <br />ensure uninterrupted water supply. A minimum of one person is assigned to this task <br />that can then assume a support role. <br /> <br />• Establish an effective water flow rate of 300 gallons per minute. This will be supplied <br />to a minimum of two hand lines each operating at a minimum flow of 100 gallons per <br />minute. Each hand line must have two individuals assigned with one serving as the <br />attack line and the other as a back-up line. <br /> <br />• Provision of one support person to handle the hydrant hookup, utility control, forcible <br />entry and assist in deploying fire hose lines. <br /> <br />• Establish a search and rescue team. Each team will consist of a minimum of two. <br /> <br />• Establish a ventilation team. Each team will consist of a minimum of two personnel. <br /> <br />• Establish an initial rapid intervention team (RIT). Each RIT team shall consist of a <br />minimum of two properly trained and equipped personnel. <br /> <br />Critical tasking will vary depending on the size and nature of the incident. The Center for <br />Public Safety Excellence (CPSE) provides a suggestive list of tasks that need to be
The URL can be used to link to this page
Your browser does not support the video tag.