My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-25-2021 Council Packet
Orono
>
City Council
>
2021
>
01-25-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2021 9:54:48 AM
Creation date
4/15/2021 9:52:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Roe Proposal Page 1 3 <br />II: Concept Development <br />§ Identify and briefly describe specific stories that are well supported with historical images <br />(photos, postcards, maps, drawings). <br />§ Match specific stories to trail locations, determine the number of signs for a complete and <br />satisfying trail experience. <br />§ Select a range of historical images for each story/location. This preliminary list will provide <br />examples of the kinds of images needed for each trail sign. <br />§ Develop an integrated overview for all interpretation at the park (existing and future). This <br />includes the number and approximate scale of elements illustrated with examples and <br />precedents. <br /> <br />III: Implementation Plan <br />§ Recommend production and installation methods, materials, and vendors. <br />§ Develop cost opinions for research, writing, graphic design and illustration, image <br />acquisition, sign production. <br />§ Suggest a timeline and phasing for implementation. <br /> <br />Project Assets <br />This project is benefitted by a wealth of historical information and existing planning documents. <br />These include a comprehensive archaeological survey, an up-to-date site master plan, and an <br />accessible body of historical research and knowledgeable contacts. Most importantly, the <br />project holds the great advantage of a deep trove of compelling stories, images, and artifacts. <br /> <br />Anticipated Challenges <br />§ Research and planning may be delayed until COVID restrictions are lifted and research <br />facilities are reopened. <br />§ The two major periods of historical interest—Big Island Amusement Park and the Veteran’s <br />Camp—are mixed and layered on the site. This presents a potentially confusing context for <br />visitors while on the trail. <br />§ Given that the trail alignments have already been established, viewing locations for the <br />various features may be limited. <br /> <br /> <br /> <br />FEES <br />Parts I & II $8,000 <br />(invoiced upon delivery of Interpretive Framework and Draft Concept Plan for review, <br />March 15, 2021) <br /> <br />Parts III $2,000 <br />(invoiced following submission of final plan, April 15, 2021) <br /> <br />Expenses <br />§ Fees for images will be invoiced for reimbursement at cost. Anticipated less than $500. <br />§ Project deliverables will be submitted in digital form only. No printing costs anticipated. <br />§ No reimbursable travel costs are anticipated for this project.
The URL can be used to link to this page
Your browser does not support the video tag.