My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-25-2021 Council Packet
Orono
>
City Council
>
2021
>
01-25-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2021 9:54:48 AM
Creation date
4/15/2021 9:52:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Prepared By: JG Reviewed By: Approved By:RJO <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is to gain approval to proceed with the golf course irrigation <br />pond dredging project. <br /> <br />2. Background. Staff recommends that the irrigation pond at the golf course be dredged as part of <br />maintenance of the pond and the irrigation system. Currently, an excess of organic build up has developed <br />in the bottom of the pond which has led to increased algae blooms and aquatic weeds, low water clarity, <br />an unsightly appearance, and foul odors. The irrigation system is a pump system which draws water out <br />of this pond to water the turf areas throughout the golf course. Over the last few years the heavy algae <br />blooms and submerged weeds has clogged up the irrigation suction screen and decorative fountain <br />numerous times which renders these systems unusable. By dredging the irrigation pond the reliability of <br />the irrigation system will return and the pond will regain its lost aesthetics as a golf course water feature. <br /> <br />3. Project Scope. Dredge the Stormwater and Irrigation Pond at the Orono Golf course. <br /> <br />4. Cost. <br /> <br />a. Overall project cost. <br />Project Activity Who Cost <br />Soil Testing Braun InterTech $3000 <br />Dredging Blackstone Contractors, LLC $37,310 <br />Site Restoration City Staff $5000 <br />Total $ 45,310 <br /> <br />b. Dredging. Staff received two proposals from specialty contractors who have experience with <br />dredging ponds. The proposals are listed in the table below. <br /> <br />Contractor Quote <br />Blackstone Contractors, LLC $37,310.00 <br />Veit $45,585.00 <br /> <br />5. Funding. The City Capital Improvement Plan budgeted $50,000 for the project. Project will be <br />funded by the stormwater Fund. The projected 2021 EOY fund balance is $1,300,000. <br /> <br />6. Staff Recommendation. Staff recommends acceptance of the proposal from Blackstone Contractors, <br />LLC for $37,310.00 to dredge and haul away 850 cubic yards of material from the golf course irrigation <br />pond <br /> <br />COUNCIL ACTION REQUESTED <br /> <br />Motion to accept the proposal from Blackstone Contractors, LLC for $37,310.00 to dredge the <br />Stormwater and Irrigation Pond at the Orono Golf Course. <br /> <br />Item No.: 10 Date: January 25, 2021 <br />Item Description: Golf Course Irrigation Pond Dredging (21-029) <br />Presenter: Jason Goehring <br />Parks and Golf Course Supervisor <br />Agenda <br />Section: <br />Consent Agenda
The URL can be used to link to this page
Your browser does not support the video tag.