My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-2021 Council Packet
Orono
>
City Council
>
2021
>
02-22-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2021 9:39:41 AM
Creation date
4/15/2021 9:37:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br /> <br />NO. ________________________ <br /> <br /> <br />4 <br /> <br /> <br />a. Stormwater and Drainage Trunk: The property will be subject to the Stormwater <br />and Drainage Trunk Fee (SW&DT Fee) of $40,300.00 (Number of new lots (5) <br />times per lot amount ($8,060). <br /> <br />b. Sewer: The costs to construct the Sewer system within the site will be the <br />developers responsibility. The Metropolitan Council SAC charge which is <br />currently $2,485 per dwelling unit will be due at the time of building permit for <br />each lot. The City’s sewer charge is $5,380.00 per lot (5), or $26,900.00. <br /> <br />c. Park dedication: $27,750.00 ($5,550 x 5 new lots). <br /> <br />B. General conditions imposed on preliminary plats shall apply, and are as follow: <br /> <br />1. Appropriate traffic control signage within and pertinent to the site shall be installed <br />by the Developer subject to the City Engineer's review and approval. <br /> <br />2. Erosion control shall adhere to "Best Management Practices for Protecting Water <br />Quality in Urban Areas" and to the approved SWPPP. All erosion controls as <br />required by the City and the MCWD shall be in place prior to commencing grading <br />and excavation on the site. All such erosion control measures shall be maintained <br />in working order until the site is vegetated and stabilized. <br /> <br />3. The construction limits shall be clearly marked with adequate fencing to prevent <br />any construction damage or disturbance of any trees and vegetation outside of the <br />construction limits area. Developer shall identify trees to be preserved on site, shall <br />mark them on a site plan, and shall take extraordinary measures such as fencing, <br />signage, etc. to ensure they are not disturbed. <br /> <br />4. This approval is based upon the known issues that may affect this project, but this <br />approval does not limit the City from revising or amending these conditions as the <br />review process continues. <br /> <br />5. Council approval is based on the entire record, above Findings. <br /> <br />6. Any amendments to the plans which are not in conformity with City codes may <br />require further Planning Commission and City Council review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.