Laserfiche WebLink
� <br /> �2, 6 � /��� � <br /> September 2, 1986 � <br /> Dear Crystal Hay Resident: <br /> The sanitary sewer project in the Crystal Bay area was <br /> completed, inspected and accepted on June 11, 1986. There are <br /> somearestoration items yet to be completed. <br /> If you have not already done so, you can connnect your <br /> residence or business to the sanitary sewer main line. <br /> The deadline for connection to the sewer main line is 16 � <br /> months from June 11, 1986 0� October 11, 1987. <br /> A licensed contractor is required to make this type of <br /> connection in the City of Orono. � <br /> i <br /> The contractor must obtain a permit from the City prior to _ <br /> any work being done. <br /> The permit fee is $30.50. A Service Availability Charge � <br /> (SAC) of $475.00 must be paid before osc at the time the permit is � <br /> issued. Be advised �that the City of Orono is only the collection ; <br /> agency for the SAC fee. The Metropolitan Waste Control � <br /> Commission actually receives these monies. � � <br /> I <br /> Some of you may have already paid the SAC fee in advance. j � <br /> For your information, your existing septic tank must be ' <br /> pumped and filled with approved fil 1 when connection to �the sewer - � <br /> main has been completed. <br /> If you have any quest3.ons, please feel free to call me at <br /> 473-7359. � <br /> Sincerely, i <br /> ���� <br /> � <br /> John R. Gerharclson, <br /> Public Works Coordinator • <br /> JRG/tln <br /> , <br /> 3 I <br /> I <br />