Laserfiche WebLink
ii�%1�%�Ji, 11:15 FA1 1i12�975011 S P TESTI�c, I�i; f�ji.i3 <br /> Due to the system being sized for 1.27sq.ft. (perc rate 9 0.4) low water use facilities will <br /> nEed tq be instelled in all three properties. If water softners are used, they mus# be <br /> diverted either to the �round surtace (not the lake) or install approximately 50 lin.ft. of <br /> g�ave�less trench. <br /> The new tanks may be plastic �ut must be heavy duty due to the high water tabie, see <br /> the site plan for the focation. <br /> A pumping chamber will need to be installeGi to lif[t�e septic effluent to the treatment <br /> area. The power supply �nd switChes must be located outside fhe manhple �nd <br /> pumping ch�mber in a weather proof enclosure. A waming device must be instalfed with <br /> a iight and s�und dBviCe, thi� is in c�se of a pump failure. An exterior devi�e wi11 need <br /> to be instslled. <br /> AH neighboring we{Is are located greater than 100' away from the proposed treatment <br /> area and 50' away on this site (de�p well). Approval wi{I be needed to be 50` away from <br /> a well with a t�nk at t[�e Rabb cabin. <br /> Keep all he�vy gquipment off of the proposed treatment area before and after <br /> Cor�struction. The treatment �rea should kye marked off befor� construction. This <br /> Design is not valid & the system wi11 need to be relocated if failure to prpt�ct the areas <br /> prapased for �n-Srte Sewage Treatment accurs_ <br /> With proper installation and maintenance, this system should have no prohlem in <br /> treating septic efFluent e�fec#ively. <br /> Nothing other than gray water �laundry, showers, etc,} should be disposed of into the <br /> septi� tanks. Garbage disposals are not recommended, due to adding more solids 8� <br /> fine solids passing through to the system. Excessive amounts of soaps, cleanin� agents <br /> & chlonne agents m�y kill the bacteri� needed to treat septic effiuent. Additives are not <br /> recommended. Recommend to pump & clean yoUr tanks through the manhole by a <br /> certifed pumper every 2 years. �hec�c with your pumper to set up a schedule. <br /> . � � r <br /> �� <br /> Steven B. Schirmars <br /> 4� <br /> 2 <br />