Laserfiche WebLink
: <br /> /z �� ,���. „� <br /> September 2, 1986 <br /> Dear Crystal Hay Residento <br /> The sanitary sewer project in the Crystal Bay area was <br /> completed, inspected and accepted on June 11, 1986. There are <br /> somearestoration items yet to be completed. <br /> If you have not already done so, you can connnect your <br /> residence or business to the sanitary sewer main line. �I <br /> i <br /> The deadline for connection to the sewer main line is 16 <br /> months from June 11, 1986 or October 11, 1987. <br /> A licensed contractor is required to make this type of <br /> connection in the City of Orono. �, <br /> The contractor aaust obtain a permit from the City prior to <br /> any work being done. <br /> The permit fee is $30.50. A Service Availability Charge <br /> (SAC) of $475.00 must be paid before or at the time the permit is <br /> iasued. Be advised that the City of Orono is only the collection ; <br /> agency for the SAC fee. The Metropolitan Waste Control i <br /> Commission actually receives these monies. � <br /> li <br /> - Some of you may have already paid the SAC fee in adv�.nce. <br /> For your information, your existing septic tank must be � <br /> pumped and filled wi�h approved fil 1 when connection to the sewer � � <br /> main has been completed. I <br /> i <br /> If you have any questions, please feel free to call me at �� <br /> 473-7359. � I <br /> Sincerely, � ; <br /> ��.�/� I <br /> � � <br /> John R. Gerhardson, ', <br /> Public Works Coordinator • '� <br /> JRG/tln <br /> I <br /> � <br />