Laserfiche WebLink
� INSPECTOR CHECKLIST - mound <br /> 229Q Abi�don Way,Orono <br /> a �vF.i,L se�badrs: 20'to preuure tested sewer line (5 psi for 15 min) <br /> • 54'to everythtng 1Dd'W dispersal area with shallow welt <br /> PROPERTY LII�ES aetback: 10'to everythtng <br /> Road setbacic: outer dttch,or 33'from center of twxnship road,or 65'from center of cnty road <br /> LAKE/BLUFF �back: 20'for bluff. l.akes:GD_.,ItD�,NE_. Protected wetland_ <br /> Bu�ding�baatcs: 10'for everything, 20'for disp2rsal area. <br /> WATER L[NE under pressure e�10'to bed,tank�sewer li�.(else�wer Une>1 Z"below) <br /> � Sewer line fe baffle tannectfon (no�'s, 3'between 45s, slope min 1'9n 8',max 2"in B') <br /> (nc depth req's, clean out every 100', Sch 40 D26b5 or F�91) <br /> � Septfc taMt and risers (water ttght,iinulated,proper depth,exlsdng veHHe�l by pumpir►g) <br /> mfg �QO gaUons rrone <br /> Riser ower outlet, rtser over tntet, 6"+inspectlon pipe over any remaining baffles. <br /> Ido etftuent Htter&alarm <br /> Dose tank risers and piping (water tlght,ir►wlated,proper depth,dralnback} <br /> mfg 1250 galtau <br /> � dose pump 47 gpm 18 head VERIFY PUMp tURVE 4.1 min ON 9 hr OFF <br /> � float setting drop 16.1 inches <br /> LABEL pump requirements and drawdown on riser or panel <br /> Cam lock, areep hole, suppty line access (no hard�,pipes reachabie fram grade-36� <br /> �PP�Y P�stoped 1/8"+� sW�ported by schAB sleeve, and bwied 6'+. <br /> splice box/control panel/electrical connectfons <br /> flow measurement:CT,ETAA,time dosed.Frome evater meter <br /> 8 mound rock dimensiais 10 X 52.5 <br /> 5and Ufk depth i2 irrches. (Jar test:2"sand leaves<1/8'silt after 30 min) <br /> � Absorption Sand beyond r�k 0.0 upslope 77.0 dawnslope <br /> � Bermed topsoil beyond rockbed 9 ups[ope 15 sideslope 22 downslope <br /> � caver depth of 12-18"+ YERIFI' <br /> 3 (aterais (1•Y from edge of rotk} <br /> 2.00 inch pipe size <br /> 3.0 ft lateral spacing <br /> 8 1/4' inch perForatior�s (s�l�er is ok) <br /> 3.0 ft peAoration sPBcing <br /> Air 9nlet at end of laterats, and at top feed manifold. VERIFY <br /> clean outs (rro hard�'s) <br /> 4"ir�spection pipe to hottom of rock,anchored YERIFY <br /> Abandon e�ddsting system if�seces�ry �Re-�e exfstEnB tank certif9catian <br /> manftori�plan and type • <br /> well abandaiment form if necessary <br />