My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design/info
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2255 Abingdon Way - 03-117-23-23-0008
>
Land Use
>
Septic design/info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:35:13 PM
Creation date
7/27/2015 1:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
2255
Street Name
Abingdon
Street Type
Way
Address
2255 Abingdon Way
Document Type
Land Use
PIN
0311723230008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F-17 <br /> . � <br /> � PUMP SELECTION PROCEDURE <br /> Fl�D PERFORA7FON OF A PERFORdTEp �pTERl� <br /> A Determine pump capadty: ,�,.�„„ <br /> Gravity Distribution T,,,,,, <br /> 1. Minimum suggested is 600 gallons per hour(10 gpm)to stay ahead of _ , .. � a���� �� <br /> water use rate. �''°"�5a°�"� :`�`,�-;�•�� <br /> .�., <br /> 3. Maximum suggested for delivery to a drop box of a home system is 2,700 „ , �•«••�����+o.a«.��. <br /> ��� � <br /> gallons per hour(45 gpm)to prevent build-up of pressure in drop box. .,; '-��m,,, ,Z•,o Ea�. <br /> w er aac.lo�.r <br /> .. . Mamk�r teu+M et <br /> Pressure Distibution �.�cw�sar tosr g`"�^a�•�•� <br /> 3.a. Select number of perforated laterals 3 � . � <br /> b. Select perforation spacing=�feet �,���, �� <br /> c Subt�ra�2 ft.from the rock layer]ength. <br /> �---�,�-2 ft._��feet <br /> d. Deternune the number of spaces between perforations. <br /> Length perf•spacing=�ft.+ 3 ft.= a� spaces Requined PaforaflonD�� <br /> e. �,spaces+1=�_perforations/lateral ��ttong per m�mce(gQa►j <br /> f. Multiply perforations per lateral by2 number3f laterals to �13.z'���, '�e ��� ��� <br /> get total number of perforations. ,,,�� x���,_��perforations. ��� A <br /> g' "F� X�r�_�$p�• . <br /> 1.Oa 0.56 0.74 <br /> SELECT'ED PU1V8 CAPACITY_3� gpm 2.�b �.8� 1.�4 ' <br /> B.Determine head requirements: a.Use for single family homes <br /> 1. Elevation difference between pump and point of discharge. b.Use for all other applicatiorts <br /> '� feet <br /> � Z If pumping to a pressure distribudon system,five feet for pressure <br /> rPquired at manifold if gravity s stem,zero. <br /> _�feet <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. � Pipe Length <br /> Read friction loss in feet per 100 feet from table. � Poinc of Disch, <br /> F.L= �,L f�/100 ft of pipe �j� <br /> b. Determine total pipe length from pump to discharge Elevation Diffexerscel <br /> point. Add 25 percent to pipe length for fitting �p � <br /> loss,or use a fitting loss chart. Equivalent pipe <br /> length-1.25 times pipe length= F-18b <br /> �S x1.25=�feet <br /> c Calculate total friction loss by muldplying ls���0 inch 3.0 inch <br /> gpm ��oosat� <br /> friction loss in ft/100 ft by equivalent pipe length. 10 0.69 0.20 <br /> Total friction loss= a• le x�+100= I feet 12 0.96 0.28 <br /> 4. Total head required is the sum of elevation difference, 14 1.28 0.38 <br /> special head requirements,and total friction loss. 16 1.63 0.48 <br /> 18 203 0.60 <br /> 20 2.47 0.73 0.11 <br /> �_+ .� + � 25 3.73 1.11 0.16 <br /> (1) (2) (3c) 30 5.23 1S5 0.23 <br /> ' 35 7.90 206 0.30 <br /> TOTAL HEAD �feet • '� 11.07 2.64 0.39 <br /> 45 14.73 3.28 0.48 <br /> ' S0 3.99 0.58 <br /> 55 4.76 0.70 <br /> C. Pump selection bo s.6o o.s2 <br /> j 1. A pump must be selected to deliver at least <br /> ::�s` �gpm (Step A) with at least �feet of total head(Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.