My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-15-2021 Planning Commission Packet
Orono
>
Planning Commission
>
2021
>
03-15-2021 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2021 10:12:20 AM
Creation date
3/16/2021 9:15:47 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Preliminary Plat Application <br /> Long Bridge <br /> Page 2 <br /> h. An impervious surface exhibit must be provided to verify areas match the calculations. The <br /> exhibit must indicate existing and proposed impervious surfaces. <br /> i. Curb,gutter, and a spillway must be provided on the east side of the road at the entrance to <br /> direct runoff to the basin,or the Drainage Area Map and calculations should be revised to <br /> indicate runoff from this area bypassing Basin#4. <br /> j. A stormwater management plan outlining how the proposed improvements will meet all <br /> requirements must be submitted for review prior to Preliminary Plat approval to ensure <br /> adequate siting is available for required facilities. <br /> 2. The weir for Wetland A and the culvert under the driveway for Long Lake Creek must be <br /> indicated on the plan. <br /> 3. Final Plans must include the following: <br /> a. Grading,Drainage,and Erosion Control Plan <br /> b. Street Construction Plan <br /> c. Utility Plan <br /> d. Landscape and Restoration Plan <br /> e. SWPPP meeting NPDES requirements <br /> 4. The applicant will be required to obtain Minnehaha Creek Watershed District(MCWD) <br /> approval and permitting. An existing access route to the Wetland A weir is located on the <br /> northeast side of the wetland. This access route should be confirmed as adequate with MCWD. <br /> A copy of any approvals or permits required must be submitted prior to Final Plat approval. <br /> 5. The applicant will be required to obtain a General Construction Permit(NPDES)to discharge <br /> stormwater associated with construction activity since more than 1 acre will be disturbed. A <br /> copy of the permit must be submitted prior to any land disturbing activity. <br /> 6. The applicant will be required to obtain Hennepin County approval and permitting for <br /> connection to County Road 6. A copy of any approvals or permits required must be submitted <br /> prior to Final Plat approval. <br /> 7. A variance will be required to allow a driveway approach serving more than two lots. The <br /> driveway for Lot 2 also serves 1305 and 1405 Sixth Avenue North. In addition,an Access <br /> Easement should be established over the driveway across Lot 2 and recorded with the Final Plat <br /> per the City's approval process. <br /> 8. Since this parcel is in the Metropolitan Urban Service Area(MUSA),the lots are eligible for <br /> connection to the municipal sanitary sewer system. The most likely connection point would be <br /> on the south side via a low-pressure force main system. Additional discussion with the City <br /> regarding sanitary service should be undertaken to determine viability of municipal service. <br /> 9. The applicant will be required to submit a Maintenance Agreement for all stormwater <br /> management structures and facilities. The agreement must define maintenance responsibilities <br /> following completion of project, specify types and frequencies of inspection and maintenance <br /> activities, designate who will conduct inspection and maintenance activities,and outline <br /> reporting requirements. The Agreement will be recorded with the County per the City's <br /> approval process. <br /> 10. Drainage and Utility Easements msut be provided as follows: <br /> a. Over all sanitary forcemain. <br /> b. Over all stormwater management facilities used to meet regulatory requirements,including <br /> access routes. <br /> c. Over all wetlands, creeks,and buffers, including existing access route to the Wetland A <br /> weir on northeast side of wetland). <br /> d. All swales, structures,and piping providing drainage for multiple properties(including the <br /> weir for Wetland A and the culvert for Long Lake Creek under the shared driveway). <br /> e. 5' along all side lot lines,unless adjacent to Development boundary. <br /> f. 10' along all front lot lines,rear lot lines,and adjacent to Development boundary. <br /> H:\ORNO\Surface Water Management\MS4 Administration\MCM-5Post-Construction Stormwater Management\2 Site Plan Reviews\Long Bridge Long <br /> Bridge_PrePlatReview 2021-03-01.docx <br /> Bolton&Meek is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.