Laserfiche WebLink
Preliminary Plat Application 7 1 6 5 <br /> Shoreline Estates <br /> Page 3 <br /> maintained. <br /> 13. A sump manhole must be provided upstream of all inlets to the rain garden in the street per <br /> NPDES requirements. <br /> 14. Manholes must be included on storm sewer to rain garden as necessary to route runoff directly <br /> into basin. <br /> 15. The street must transition from urban to rural street section at Station 4+50 to better manage <br /> runoff not routed to the rain garden. Ditches do not need to be included. Due to the existing <br /> wetland on the west side and an existing culvert on the east,runoff will naturally drain away <br /> from the road.A Rural Typical Section should be included on the Road Plan accordingly. <br /> If you have any questions or comments,please contact me to discuss. <br /> Sincerely, <br /> Bolton&Menk,Inc. <br /> Robert E. Bean,Jr.,P.E. <br /> Water Resources Engineer <br /> CC: Adam Edwards,Director of Public Works/City Engineer <br /> H:\ORNO\C13120357\z Shoreline Estates\ShorelineEstates_PrePlatReview 2021-1-19.docx <br /> Bolton&Menk i;an equal opportunity employer <br />