My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Compliance Inspection Form - Expires 12/23/2029
Orono
>
Property Files
>
Street Address
>
S
>
Sugarwood Drive
>
2009 Sugarwood Drive - 34-118-23-21-0013
>
Point of Sale
>
Compliance Inspection Form - Expires 12/23/2029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:54:44 PM
Creation date
2/22/2021 9:59:37 AM
Metadata
Fields
Template:
x Address Old
House Number
2009
Street Name
Sugarwood
Street Type
Drive
Address
2009 Sugarwood Drive
PIN
3411823210013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date Called in <br />I Date Scheduled <br />City Of Orono <br />`,�Kf51t0a�C/ Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form <br />Property Address: 1 2009 SUGARWOOD DR <br />PID: 13411823210013 <br />Owner Information <br />Name: <br />MICHAEL MAHIGEL <br />Mailing Address: <br />(if different from <br />Property) <br />DRAIN BUSTERS <br />Phone: <br />612.325.7919 1 Email: MAHIGEL@GMAIL.COM <br />Inspector Information <br />Name: <br />MILES WINKLER <br />Company/ Organization <br />DRAIN BUSTERS <br />License number: <br />Roof drains and leaders Roof drains should not be connected to the sanitary <br />Phone: <br />952.925.9583 <br />Email: MAHIGEL@GMAIL <br />COM <br />Inspection <br />System <br />Standard <br />Pass <br />Fail <br />Roof Drains <br />Roof drains and leaders Roof drains should not be connected to the sanitary <br />sewer but should discharge to the ground outside of a building. If the roof <br />drains are connected to the sanitary sewer, disconnect them, plug any open <br />connections to the sanitary sewer using a non -shrink permanent material, and <br />redirect the roof drains onto the ground outside the building. <br />Foundation <br />Foundation drains are underground pipes that collect storm water from <br />Drains <br />around the base of a building and into a sump basket, where it is then <br />pumped outside of the building. Foundation drains should not be connected <br />to the sanitary sewer. <br />Sump Pumps <br />Sump pumps are designed to capture surface or ground water that enters <br />basements or crawl spaces and pump it away from the house. The basic sump <br />system includes drain tile, a sump pit, a sump pump, a float or switch, and a <br />drain line. Sump pumps should not be connected to the sanitary sewer. <br />Sewer Service <br />Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary <br />Line <br />Sewer Lines. All sanitary sewer lines serving Property, from the house to the <br />main line, shall be in a safe and functional condition and shall be free from all <br />leaks, failures including but not limited to partially collapsed sections or tree <br />root intrusion. The sanitary sewer lines shall meet the City Code standards and <br />specifications. Details on back of this sheet <br />Notes: <br />Sewer was inspected on 12-23-19 by Drain Busters. Brandon Mauerer <br />Brian Clark with City of Orono Public Works reviewed. Both agree <br />sewer line looks good. 2/22/2021 - AH <br />Inspectors Signature: Reviewed by Brandon Mauer & Brian Clark Date: 2/22/21 <br />Owners signature: I Date: <br />CityReview <br />21 Compliant 1 D Corrective Action Required <br />Certificate of Compliance Expires: 12/23/2029 Corrective Action Due by: <br />Date: <br />02/22/2021 <br />Signature: <br />Name: Anne Hentges <br />Service Line Inspection Details <br />
The URL can be used to link to this page
Your browser does not support the video tag.