Laserfiche WebLink
Pave Parking Lot <br />Playground <br />Picnic table <br />Bench <br />Porta Potty <br />w/ surround <br />Swim Bouys <br />Swim <br />Platform <br />Canoe / <br />Kayak racks <br />Wetland area <br />(approximate) <br />Grass Open Area <br />Picnic table <br />Summit Beach Vision Site Plan <br />Pave Parking Lot ~ 8400 ft sq Approx. 28 spots $ 43,400 <br />Rain Garden If needed to manage parkign and street runnoff $ 2,000 <br />Play Ground "Natural looking playground" $ 90,000 <br />Gravel Path ~330ft long 4 ft wide $ 8,000 <br />Picnic Table $2400 ea x 3 $ 7,200 <br />Shade Sail $ 3325 ea x 3 $ 9,975 <br />Bench $850 ea x 2 $ 1,700 <br />Dock 32’ Dock for launching canoes and kayaks $ 4,500 <br />Canoe Rack Add one for total of two racks storage for 12 $ 1,000 <br />Porta Potty <br />Surround Move to side of parking lot and screen with vegetation $ 2,000 <br />Swim Platform 10x10 ? $ 5,000 <br />174,775$ <br /> $ 43,694 <br /> $ 218,469 <br /> $ 21,847 <br /> $ 240,316 Total <br />Estimated <br />CostItemDescription <br />Constructuion Total <br />Design and administrative Costs (25%) <br />Sub Total <br />Contingency (10%) <br />Notes: <br />1.Fence is existing and to be replace as part of scout project in 2020 <br />2.Existing signs to be replaced. Entrance Sign and Information sign replacement will be done with <br />East Long Lake Project. <br />3.Dead/dying trees will either be address as maintenance items or will be incidental to site prep for <br />playground construction. <br />Sign Location <br />1.Canoe launch area sign <br />2.Park Entrance Sign <br />3.Park Information Sign <br />4.Beach Rules/ Safety <br />Warning Sign <br />1 <br />2 <br />3 <br />4 <br />As of 18SEP20 <br />Rough Cost Estimate <br />Disclaimers: <br />This is intended to be a working document for city Staff and Park <br />commission discussion and brainstorming. <br />-It is not an approved plan for execution . <br />-It is not to scale. <br />-Locations and sizes are approximate. <br />-Costs are rough order of magnitude planning estimates.