Laserfiche WebLink
Capital Improvement Plan, City of Orono <br />Parks Planning <br />2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 <br />Summit Beach Improvements (pave parking) <br />$54,000 <br />Assumes done with E. Long Lake Trail On hold. <br />Summit Beach Improvements (Playground, tables, <br />signage, toilet improvements)$41,280 <br />Assumes playground grant of $15K <br />Big Island ADA Trails, amenities, restroom <br />131,531$ BI Master Plan <br />Plus Grant for $200K and assumes <br />donation for $120K. <br />City contribution increased by council at award based on fundraising not <br />reaching goal <br />French Creek Park (Tree Maintenance and Planting) <br />$20,000 <br />Crystal Bay Park Improvements (Scope to be determined)300,000$ Assumes Grant for 50% <br />Basket Ball Court Surfacing - Crystal Bay $10,000 Assumes Grant for 50% <br />Hackberry Improvements $300,000 <br />Need Master plan Assumes grant for <br />50% <br />Playground Equipment (Antoine) <br />$65,000 Replacement Cycle <br />Assumes Partial Grant for Playground <br />equipment <br />Playground Equipment (Crystal Bay, Navarre, Hackberry, <br />Bederwood,Antoine)70,000$ Assume 20 year life cycle. <br />GC Wetland and Fairway #4 Improvements <br />$160,000 Grant with MCWD if available <br />GC Outdoor Gas Fire Pit Area <br />$26,885 CMP GC Priority 4 <br />Council removed from CIP on 28 Oct 19. <br />$26885 <br />GC Lawn Bowling $80,000 CMP GC Priority 5 <br />GC Tow Rope $102,000 CMP GC Priority 6 <br />GC Perimeter Trail $214,700 CMP GC Priority 7 <br />GC Miscellaneous improvements $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 Added and Park Chair's request <br />Dock Replacement (15 year life) <br />$10,000 $10,000 Replacement Cycle Plan for one every 5 years <br />Lake access Refresh (gravel, signage, fencing and gates) <br />10000 10000 Maintenance Cycle Plan for one every 5 years <br />CR 6 Trail (OCB - Willow) Improvement $36,402 <br />East Long Lake Road to Trail <br />$134,000 CMP Trial priority 1 <br />Plus Grant for 150,000 and funding from <br />Stormwater Fund <br />Trail Construction along CSAH 19 (Livingston to Dakota) <br />$160,000 CMP Trail Priority 2 <br />3 way cost share with HC and TRPD. <br />Moved from 2019 to 2020 <br />Moved to 2020 based on TRPD update <br />Trail construction along North Arm drive to Lakeview <br />Legacy Park $80,000 CMP Trail priority 3 <br />Ideally tied to road project which HC has <br />forcast for 2022 <br />Trail committee recomends move to 2021. <br />CSAH 112 PH 3 Trail (School to CSAH 6) <br />$188,640 <br />Connects to CMP Trail <br />priority 4 <br />Assumes 50% cost share with HC moved <br />to 2022 with project. <br />Trail Construction along OCB and North Shore (Luce Line <br />to Dakota)$567,000 CMP trail priority 5 Assumes Cost Share with HC or TRPD <br />Trail committee Recommends move to 2022. <br />Trail Construction along Hunter or Ferndale Roads <br />connection Luce line to northern boundary <br />$133,890 CMP Trail priority 6 Assumes Cost Share with HC or TRPD <br />Learend form TRPD that this would be part of their Diamond Lake Regional Trail <br />Project. <br />Trail Access to Lowry Woods <br />$100,000 CMP Trail Priority 7 <br /> Aerator $24,000 <br />Fertilizer Spreader $6,000 <br />Sprayer $34,300 <br />Skid loader $53,500 <br />Tee Mower $38,000 <br />Top Dresser $16,800 <br />Greens Mower $9,700 <br />Rough Mower $65,500 <br />Mower (Big island)$8,961 <br />Greens / Turf Roller $13,000 <br />Totals $353,531 $217,280 $279,342 $534,885 $40,000 $235,000 $190,000 $334,390 $543,661 $657,000 <br />Lurton gravel trails $20,000 <br />Lurton gravel trails 20,000$ <br />Parking Lot Repave 50,000 <br />Prairie Maintenance Contract 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ <br />2020 NotesJustificationCommentsProject <br />Lu <br />r <br />t <br />o <br />n <br /> <br />P <br />a <br />r <br />k <br /> <br />Fu <br />n <br />d <br />Pa <br />r <br />k <br />s <br />Go <br />l <br />f <br /> <br />C <br />o <br />u <br />r <br />s <br />e <br />La <br />k <br />e <br /> <br />A <br />c <br />c <br />e <br />s <br />s <br /> <br />Po <br />i <br />n <br />t <br />s <br />5-Year CIP Planning Period <br />Tr <br />a <br />i <br />l <br />s <br />Eq <br />u <br />i <br />p <br />m <br />e <br />n <br />t