My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-16-2021 Planning Commission Packet
Orono
>
Planning Commission
>
2021
>
02-16-2021 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 3:57:08 PM
Creation date
2/17/2021 2:01:41 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SLo1v0 <br /> To: Chair Ressler and Planning Commission Members <br /> Ron Olson, Interim City Administrator ,N. <br /> ti „...e • <br /> From: Jeremy Barnhart,AICP Z�kESHo��`L <br /> Community Development Director <br /> Date: February 16, 2021 <br /> Subject: #LA21-15,William Stoddard o/b/o Miller Living Trust PID3411823320002 <br /> Sketch plan review <br /> Application Summary: The applicant is requesting sketch plan comment on a proposed <br /> development on a parcel of land immediately north of the Long Lake Fire Station at 340 Willow <br /> Drive. <br /> Staff Recommendation: Planning Department Staff recommends feedback on 5 variables: <br /> (Zoning, Use, Access, Stormwater, and Design. The Commission may table action to allow the <br /> developer to address comments made. <br /> Background <br /> The subject parcel is a long and narrow parcel 1.71 acres in size immediately north of the Long <br /> Lake fire station at 340 Willow Drive North. <br /> The subject property is guided for urban medium high density in the 2040 Comprehensive plan, <br /> which suggest densities in the 3-10 units per acre range. <br /> The project is the first formal development proposal for the subject parcel in several years. In <br /> 2010,the property was included in the CommonBond proposal (Case 10-3460). That project <br /> included development of the adjacent city lot immediately to the east of the Long Lake Fire <br /> Station and was ultimately withdrawn by the applicant. <br /> Proposal <br /> Use <br /> The proposed project is for 12 residential units in 6 twin home type buildings. All buildings face <br /> south in a linear configuration. The use and density is consistent with the Comprehensive Plan. <br /> Access <br /> This site is adjacent to the Long Lake Fire Station,and when that site was platted (Willowfire, <br /> 2002), it was anticipated that the new public road (Rettinger Driver)would provide access to <br /> `future development'. While the subject parcel is not part of Willowfire, staff has supported the <br /> connection to this road, in part to be consistent with the long term plan for the area, and in part <br /> to move a street intersection away from the bridge over Highway 12,which presents some <br /> safety concerns. <br /> To develop as proposed,an easement for access over a portion of the city lot (Outlot A)will be <br /> necessary. The history of the Fire Station lot is provided as Exhibit H. <br />
The URL can be used to link to this page
Your browser does not support the video tag.