My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-19-2021 Planning Commission Packet
Orono
>
Planning Commission
>
2021
>
01-19-2021 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2021 11:06:44 AM
Creation date
1/22/2021 11:04:02 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�7 �����` CITY OF ORONO <br /> Street Address: Mailing Address: Telephone(952)249-4600 <br /> / 2750 Kelley Parkway P.O.Box 66 Fax (952)249-4616 <br /> r <br /> \!q Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us <br /> /CFESHO� <br /> November 19, 2020 <br /> Whitten Associates, Inc. <br /> Attn:Timothy Whitten VIA EMAIL <br /> 4159 Heatherton Place tim@whittenassociates.com <br /> Minnetonka, MN 55345 <br /> Re: Shoreline Estates <br /> File#LA20-000048 <br /> Mr. Whitten, <br /> The City has reviewed your revised, 6 lot plan received November 18, 2020. After careful review, we have the <br /> following comments. <br /> Lots/Setbacks <br /> 1. Please show the bluff on lots 5 and 6 and the 30-foot top of bluff setback. <br /> 2. The plans indicate the amount of contiguous dry buildable area for lots 1-3. Please also include that <br /> calculation for lot 5. <br /> 3. Please show the 75-foot lake setback for lots 1-3,and 5. <br /> 4. The street side yard setback for Lot 1 is 30 feet. <br /> 5. Is an entrance monument proposed? If so, details should be provided and it should be located either <br /> within an easement or outlot. <br /> Average Lakeshore Setback <br /> 6. The plan shows an average lakeshore setback (ALS) line to the north, through lot 5, and to the south, <br /> through lots 1-3. Since upon platting, these lines will go away; showing these lines may add confusion. <br /> Please provide two exhibits: <br /> a. An exhibit showing current Average Lakeshore Setbacks impacting 1700 Shoreline (do not show <br /> any proposed lots, or any proposed house pads). The scale may need to expand to incorporate <br /> the principal structure of 1100 Millston in the graphic. <br /> b. An exhibit showing the proposal without the average setback line, because this will not be known <br /> until the lots are developed. <br /> Streets <br /> 7. Hennepin County has provided comments in a letter dated August 17, 2020,attached as Exhibit A. <br /> 8. The cul de sac design exceeds the minimum ROW width. However, because of the center island, please <br /> provide a turning template to illustrate that a firetruck can navigate the cul de sac. The plan has been <br /> forwarded to the Fire Chief for his comment. <br /> 9. The cul de sac measures 1005 feet from Shoreline ROW to the furthest edge of the pavement, through <br /> the center of the cul de sac. Because there may be a measuring error, please provide an exhibit showing <br /> the distance. <br /> Utilities <br /> 10. Engineering(sanitary,storm sewer, road design) needs to be completed based on this layout in order for <br />
The URL can be used to link to this page
Your browser does not support the video tag.