Laserfiche WebLink
DISTANCES CALL-OUTS: �i /ALL <br /> SOLAR PANELS -INVERTERS:5'MAX ENERGY <br /> INVERTERS-IQ COMBINER PANEL:75'MAX 1:SOLAR PANELS <br /> IQ COMBINER PANEL-UTILITY PV AC DISCONNECT:2' 2:INVERTERS NORTH SHORE DR <br /> UTILITY PV AC DISCONNECT-PV PRODUCTION METER:2' 3:ENPHASE ID COMBINER PANEL COMPANY INFORMATION <br /> PV PRODUCTION METER-UTILITY ESS AC DISCONNECT:2' 4:UTILITY PV AC DISCONNECT ALL ENERGY SOLAR,INC <br /> UTILITY ESS AC DISCONNECT-BI-DIRECTIONAL METER:2' <br /> BI-DIRECTIONAL METER-OFF-PEAK METER:2' 5:PV PRODUCTION METER 1264 ENERGY LANE <br /> OFF-PEAK METER-MAIN LOAD PANELS:5' 6:UTILITY ESS AC DISCONNECT ST PAUL,MN 55108 <br /> MAIN LOAD PANELS-OFF-PEAK LOAD PANEL:2' 7:BI-DIRECTIONAL METER - ' (800)620-3370 <br /> OFF-PEAK LOAD PANEL-TESLA BACKUP GATEWAY:2' 8:OFF-PEAK METER - INFO©ALLENERGYSOLAR.COM <br /> TESLA BACKUP GATEWAY-GENERATOR TRANSFER SWITCH:2' 9:MAIN LOAD PANEL(1 OF 2) <br /> GENERATOR TRANSFER SWITCH-ENERGY STORAGE SYSTEM:2' 10:MAIN LOAD PANEL(2 OF 2) O CLIENT INFORMATION <br /> 11:OFF-PEAK LOAD PANEL <br /> NOTES: 12:TESLA BACKUP GATEWAY / <br /> 13:GENERATOR TRANSFER SWITCH BRIAN P O'CONNELL <br /> 1.LOCATION OF SERVICE PANEL AND ELECTRICAL 14:ENERGY STORAGE SYSTEM 3145 NORTH SHORE DR <br /> EQUIPMENT ARE SHOWN.FINAL LOCATION MAY WAYZATA,MN 55391 <br /> CHANGE <br /> - PO 38607 <br /> 2.LOCATION OF SERVICE PANEL AND ADDITIONAL <br /> ELECTRICAL EQUIPMENT NOT DRAWN TO SCALE /� SYSTEM DETAILS <br /> 3.PV INTERCONNECTION IS A SECONDARY BO H N'S POINT R D NOTES: <br /> INTERCONNECTION /500' <br /> 4.AC DISCONNECT AND PRODUCTION METER WITHIN 1 J 1.(30)ENPHASE)= .7Dk <br /> INVERTER(S)=8.70kW AC <br /> 10'OF MAIN SERVICE METER/BI-DIRECTIONAL 2.ARRAY 1: <br /> METER. 24/7 UNESCORTED KEYLESS ACCESS TO BE O 180°AZIMUTH,2e°TILT <br /> PROVIDED FOR UTILITY AC DISCONNECT,PV (30)LG 375W=11.25kW <br /> PRODUCTION METER,8 BI-DIRECTIONAL METER. ,:,.,.. <br /> 5.PV EQUIPMENT SHALL BE INSTALLED IN m / <br /> ACCORDANCE WITH NEC 690 AND POSTED WITH <br /> APPLICABLE WARNINGS,SIGNAGE,AND PLAQUES , , / <br /> PER NEC ,690-17,8 PS EA(b)(5). �� <br /> 6.CIRCUITS: <br /> (3)CIRCUIT(S)OF 10(20AMPS EACH) <br /> -44411111111r <br /> ACCOUNT:51-0293230-7 <br /> + ,mL PREMISE:302201293 <br /> METER:43000153 <br /> �, CASE#03946721 <br /> ''.#11 /411,01 <br /> AZIMUTH <br /> N <br /> i <br /> � <br /> ] <br /> AR ( �""! ""-. -.> REVISIONS <br /> 'N �© .j LAST:09/14/20 MG <br /> '01.1111111111 <br /> I <br /> tti <br /> m PROJECT-PAGE TITLE <br /> ll <br /> LABELS LOCATED ON PV PRODUCTION METER,BI- ' <br /> 4'4" <br /> Q SITE MAP <br /> DIRECTIONAL METER,AC DISCONNECT(S),INVERTER(S),AND <br /> APPROPRIATE LABELS ON MAIN ELECTRIC SERVICE.ALL <br /> LABELS ARE PERMANENT,WEATHERPROOF,AND DURABLE PAGE NUMBER <br /> THERE ARE NO CLEARANCE ISSUES DUE TO OVERHEAD A 1 <br /> POWERLINES. <br />