My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-19-2021 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2020-2029
>
2021
>
01-19-2021 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2021 11:06:44 AM
Creation date
1/22/2021 11:04:02 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PC Exhibit F <br /> VOf VQ <br /> CITY OF ORONO <br /> Street Address: Mailing Address: I Telephone(952)249-4600 <br /> ,/ ass2750 Kelley Parkway P.O.Box 66 Fax (952,249-4616 <br /> Orono,MN 55356 Crystal Bay,MN 55323 www.d.orono.mn.us <br /> 4 <br /> - SHOS', <br /> January 12, 2021 <br /> Whitten Associates, Inc. <br /> Attn:Timothy Whitten VIA EMAIL <br /> 4159 Heatherton Place tim@whittenassociates.com <br /> Minnetonka, MN 55345 <br /> Re: Shoreline Estates <br /> File#LA20-000048 <br /> Mr. Whitten, <br /> The City has reviewed your revised,6 lot plan received January 6,2021. After careful review,we have the following <br /> comments. <br /> Lots/Setbacks <br /> 1. I note that the bluff setback is shown for lot 5. Please show this same 30 foot setback for the bluff adjacent <br /> to Lot 4. <br /> 2. The notation for lot area and dry-buildable area for lot 5 is difficult to read. Please clarify. <br /> 3. I note no entrance monument is proposed. Future monuments will conform to city regulations. <br /> 4. It appears that all lots meet the size and width requirements of the zoning district. <br /> Average Lakeshore Setback <br /> 5. Please provide an exhibit showing the principal structure at 1100 Millston, and the distance of that <br /> structure from Tanager Lake. This will be the ALS for lot 5 until the home at 990 Heritage Lane is built. <br /> 6. Wherever Average Lakeshore Setback is labeled, please re-label as"existing Average Lake Shore Setback". <br /> The future Average Lake Shore setback line will be applied as homes come in for permit. <br /> Streets <br /> 7. Hennepin County has provided comments in a letter dated August 17, 2020, attached as Exhibit A. Their <br /> comments include the need for a westbound right turn lane. <br /> 8. I note the label for the cul de sac length showing the length at 997 feet. <br /> Utilities <br /> 9. The City engineering is completing his review of the engineering plans, any approval of the preliminary <br /> plat will be subject to those comments. Those comments will be forwarded as soon as received. <br /> 10. Any preliminary plat approval will be conditioned on Watershed District Approval. Please verify <br /> submission to the Watershed district. <br /> Grading/Landscaping <br /> 11. Please list all trees that will be removed due to grading and those that are anticipated to be removed due to <br /> house pad preparation. <br /> 12. A landscaping plan must be provided. Street trees are required. One tree is required per 40 feet of street <br /> frontage. The City Council has recently preferred trees to be installed in natural clumps,in lieu of 40'on center <br />
The URL can be used to link to this page
Your browser does not support the video tag.