My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
April 1999 Feasibility Report
Orono
>
Property Files
>
Street Address
>
B
>
Baldur Park Road
>
1340 Baldur Park Road - 08-117-23-31-0015
>
Coddon-Koseck (lake use issue)
>
April 1999 Feasibility Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:43:31 PM
Creation date
1/8/2021 11:22:20 AM
Metadata
Fields
Template:
x Address Old
House Number
1340
Street Name
Baldur Park
Street Type
Road
Address
1340 Baldur Park Rd
PIN
0811723310015
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. Introduction <br /> The City Council has requested this report to determine the feasibility of extending the existing <br /> sanitary sewer on Baldur Park Road to the north end of Baldur Park peninsula, as shown on Figure <br /> 1. The existing sanitary sewer was constructed in 1965 to Manhole#64 shown just west of lot 20. <br /> There is one existing home and several undeveloped lots north of the existing sanitary sewer. The <br /> existing home and all lots north of Manhole #64 are within the existing MUSA boundary. The <br /> existing residence is served by a non-conforming on site septic system. City records indicate that <br /> the existing system is non-conforming due to lack of a 3-foot separation from the seasonal water <br /> table. The City has not confirmed whether there is a suitable alternate septic site to serve the existing <br /> home. The topography of Baldur Park peninsula and its' proximity to lakeshore make City sewer <br /> preferable to long term septic usage. <br /> There are currently thirteen individual lots north of the existing sanitary sewer on the north end of <br /> Baldur Park peninsula owned by two different people. The lots are not all buildable due to setbacks <br /> and City zoning ordinances. In 1982 the City granted preliminary plat approval for a total of three <br /> lots on the property north of the existing sewer. The preliminary plat was never carried out but, for <br /> the purposes of this report, we will assume the proposed sewer would serve three parcels. <br /> This report describes the sanitary improvements required to completely serve the northerly end of <br /> Baldur Park peninsula. The proposed sanitary sewer improvements are presented on Figure 2. An <br /> alternate design is presented on Figure 3. The costs of the proposed improvements are presented in <br /> the appendices and a cost summary is presented in the Cost Analysis section. <br /> Baldur Park Sanitary Sewer Improvements 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.