Laserfiche WebLink
CITY OF ORONO <br /> 1999 SANITARY SEWER IMPROVEMENTS <br /> BALDUR PARK <br /> FILE NO. 139-99-102 <br /> Sanitary Sewer-Alternate <br /> PRELIMINARY COST ESTIMATE <br /> � M tit•,..:'Wt ;:Z•i:,?aK.....W��;‘.. g, �y�.����..,a. .r .�r r \v .,. F ...KGX"- <br /> EST. UNIT EST. <br /> ITEM UNIT QUANTITY PRICE COST <br /> Mobilization LS 1 5,000.00 $5,000 <br /> Connect to existing sewer EA 1 1,000.00 1,000 <br /> Access or air release manhole EA 1 3,000.00 3,000 <br /> Trench or directionally bore 2"HDPE LF 560 24.00 13,440 <br /> 1 1/2"HDPE service pipe LF 90 15.00 1,350 <br /> 2"x 1 1/2"tee EA 3 200.00 600 <br /> 1 1/2"curb stop and box EA 3 175.00 525 <br /> Gravel driveway restoration SY 150 15.00 2,250 <br /> Bituminous street patching SY 50 20.00 1,000 <br /> Silt fence LF 200 2.00 400 <br /> Seeding w/topsoil, mulch and fertilizer AC 0.1 3,000.00 300 <br /> Residential grinder station EA 3 5,000.00 15,000 <br /> Estimated Construction Cost $43,865 <br /> +5%Contingencies 2,193 <br /> $46,058 <br /> +20%Legal, Engineering and Administration 9,212 <br /> $55,270 <br /> +5%Capitalized Interest and Bonding 2,763 <br /> Total Estimated Cost $58,033 <br />