Laserfiche WebLink
. ���� �����y� � <br /> MINUTES Or THE <br /> ORONO PLANNING COMMISSION <br /> Monday, September 18, 2006 <br /> 6:00 o'clocic p.xn. <br /> (#06-3211 Ted Capra, Continued) <br /> Capra noted a retaining wall was also necessary to help with the drainage, which has added to the <br /> hardcover, <br /> Ral�n suggested Mr. Capra requcst the City Council consider a higher amount of hardcover,but that what <br /> is Uefore the Planning Commission at this time is renewal of the variance for 30 percent hardcover, <br /> Kempf inquired whether there is a possibility of sharing the driveway, � <br /> Capra stated there is a teleplione pole in the center but that it is an option he can consider. <br /> Rahn moved,I�empf seconded,to r'ecommencl appz•oval of Application#'06-3211,Theodore <br /> and Nancy Capra,3534 Ivy Place, rene�val of a hzi'dcover vat•iance and conditional use permit, <br /> subject to tlie stipulation that the pi•oposa] meets City Engineei•'s and Staft's recommendations. <br /> VOTE: Ayes 5,Nays 0. <br /> 9. #06-3233 EPISC�PAL DIOCESE OF MIiVNESOTA, ST.EDWARDS CH[JRCH, 865 <br /> rL�+,1�1�LP�j_,'�L+ lZ(1PlL r�l��ilt�� CV1��JITIVNf'l'L ITSr.1'��N.1�I1i1�9:42 - 1�:�J3 Y.rVl. <br /> Fritz Wright, Reverend Janet Wheelock, and Roland Aberg were present. <br /> Curtis stated the applicant is requesting a conditional use pennit to conduct land alterations in excess of <br /> SUU cubic yards in the area between the church building and County Road 6,to allow construction of a <br /> columbarium,memorial garden, a 12' x 24' shed and a new monument si�i, A variance is also required <br /> due to the size of the sign proposed. <br /> Curtis recon-unended the Planning Commission discuss the issues outlined in her planner's report. <br /> Planning Staff reconunends approval of the conditional use pennit and variance subject to the <br /> recorrunendafions of the City Engineer and the sign being reduced by six inches to meet the City's <br /> monument sign ordinance. <br /> Wheeloelc noted the ehureh e�cperienced a fire. approximately four years ago and that they have Ueen <br /> involved in the process since then to reconstruct the church. <br /> Aber�stated they are in ac eement���ith the recommendations regarding the ]andscaping and the <br /> recorrunendations of the City Engineer. Aberg stated they would like to extend the fill fronl the right-of- <br /> �vay to the embanl:ment to help diminish the drop-off and address access issues. Aberg indicated they <br /> would be meeting on site with the Ciry Eneineer to discuss that f�n�ther. <br /> Curtis noted Staff�vould need a revised plan showing that change. <br /> �':1G� ?4 <br />