My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2020 Council Packet
Orono
>
City Council
>
2020
>
09-14-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2020 11:35:52 AM
Creation date
12/1/2020 11:23:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Preliminary Plat Application <br />Shoreline Estates <br />Page 2 <br /> <br />H:\ORNO\C13120357\z_Shoreline Estates\ShorelineEstates_PrePlatReview_2020-08-13.docx <br /> <br />2. Storm sewer sizing calculations must be submitted with correspond drainage area map to verify <br />adequate sizing. <br />3. Final Plans must include the following: <br />a. Grading, Drainage, and Erosion Control Plan <br />b. Street Construction Plan <br />c. Utility Plan <br />d. Landscape and Restoration Plan (including invasive species removal) <br />e. SWPPP meeting NPDES requirements <br />4. The applicant will be required to obtain Minnehaha Creek Watershed District (MCWD) <br />approval and permitting. Per recent correspondence with MCWD, they will require all <br />stormwater runoff management facilities to be installed with initial development. A copy of <br />any approvals or permits required must be submitted prior to Final Plat approval. <br />5. The applicant will be required to obtain a General Construction Permit (NPDES) to discharge <br />stormwater associated with construction activity since more than 1 acre will be disturbed. A <br />copy of the permit must be submitted prior to any land disturbing activity. <br />6. The applicant will be required to obtain Hennepin County approval and permitting for <br />connection to CSAH 15. A copy of any approvals or permits required must be submitted prior <br />to Final Plat approval. <br />7. The applicant will be required to submit a Maintenance Agreement for all stormwater <br />management structures and facilities. The agreement must define maintenance responsibilities <br />following completion of project, specify types and frequencies of inspection and maintenance <br />activities, designate who will conduct inspection and maintenance activities, and outline <br />reporting requirements. <br />8. Drainage and Utility Easements msut be provided as follows: <br />a. Over all sanitary forcemain. <br />b. Over all stormwater management facilities used to meet regulatory requirements. <br />c. Over all wetland and buffers. <br />d. All swales and piping providing drainage for multiple properties. <br />e. 5’ along all side lot lines, unless adjacent to Development boundary. <br />f. 10’ along all front lot lines, rear lot lines, and adjacent to Development boundary. <br />9. Well locations must be indicated on the site plan to confirm adequate separation distance to <br />septic facilities. <br />10. The 15” CMP under the entrance road must be replaced with a 15” RCP and existing drainage <br />patterns maintained. <br />11. To better facilitate drainage, a rural street section should be considered at the entrance south of <br />the storm sewer to the rain garden. Ditches do not need to be included. Due to the existing <br />wetland on the west side and an existing culvert on the east, runoff will naturally drain away <br />from the road. Otherwise, a curb cut must be installed at the low point with riprap to dissipate <br />energy. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.