My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2020 Council Packet
Orono
>
City Council
>
2020
>
09-14-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2020 11:35:52 AM
Creation date
12/1/2020 11:23:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br /> <br />NO. ________________________ <br /> <br /> <br />5 <br /> <br />C. Plans and Specifications. The following plans and specifications shall be submitted <br />for review and approval by the City and other appropriate jurisdictions: <br /> <br />1) Final plans and specifications for all proposed utility lines and services, including <br />any proposed revisions to existing service facilities. Proposed plans shall be <br />provided to the City for final review and approval with the Final Plan set. The <br />Public Works Department and any other pertinent reviewing agencies shall <br />review and approve all utility improvements. Final sanitary sewer plans shall be <br />provided and are subject to approval by the Public Works Department and City <br />Engineer. <br /> <br />2) Final Street and Storm Sewer Plans. <br /> <br />3) Final Grading, Drainage and Erosion Control Plan and SWPPP showing existing <br />and proposed contours, building locations, elevations, stormwater facilities and <br />calculations, utilities and erosion control measures to be used during construction. <br />General Development Plan Approval will not be granted until the Minnehaha <br />Creek Watershed District has approved the stormwater plans. <br /> <br />4) Landscaping plan to reflect a more natural pattern of replacement trees, versus a <br />lineal replacement pattern along the new road. <br /> <br />5) Any additional plans and specifications deemed necessary by the City as review <br />progresses. <br /> <br />D. Platting Process. Applicant shall complete all requirements for Final Plat Approval as <br />follows. The following list of final submittals must be submitted to the City. These <br />submittals are as follows: <br />1). Record plat drawings in the form of two (2) mylar copies (one copy for the City's <br />records and one for filing with Hennepin County) and one (1) copy reduced to 1" = <br />200'. Drawing to include: <br />A. Lot lines platted per preliminary plat survey/drawing by Gronberg <br />and Associates dated July 22, 2020 attached hereto as Exhibit A, <br />except as modified herein. <br />B. Dedication of "drainage and utility easements" 10' along exterior <br />property lines and 5' along the interior property lines.
The URL can be used to link to this page
Your browser does not support the video tag.