My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2020 Council Packet
Orono
>
City Council
>
2020
>
09-14-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2020 11:35:52 AM
Creation date
12/1/2020 11:23:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br /> <br />NO. ________________________ <br /> <br /> <br />3 <br /> <br />Engineer dated August 13, 2020 attached hereto as Exhibit B shall be suitably <br />addressed by applicant in the development plan submittal. <br /> <br />2. Easements shall be provided as required by the City Engineer. <br /> <br />3. Approval by Hennepin County of the proposed access. <br /> <br />4. Significant trees shall be preserved to the extent possible and as shown on the <br />landscaping plans. <br /> <br />5. Upon evidence of pre-settlement history (Human bones, Native American artifacts, <br />etc.), the developer will contact the city and the State Historical Preservation Office <br />prior to proceeding. <br /> <br />6. Average Lake Shore setback for the initial construction of lots 1 – 3, 6 shall be <br />illustrated on Exhibit C. <br /> <br />7. Outlots A, B, and C shall be combined with lots 1, 2, and 3 at the conclusion of the <br />platting. No permits will be issued for these lots until that is completed. <br /> <br />8. The following estimated fees are due at the time of final plat unless otherwise noted. <br />These fees are based on the 2020 Fee schedule and the fee schedule in effect at the <br />time of Final Plat approval will govern. <br /> <br />a. Stormwater and Drainage Trunk: The property will be subject to the Stormwater <br />and Drainage Trunk Fee (SW&DT Fee) of $48,360.00 (Number of new lots (6) <br />times per lot amount ($8,060). <br /> <br />b. Sewer: The costs to construct the Sewer system within the site will be the <br />developers responsibility. The Metropolitan Council SAC charge which is <br />currently $2,485 per dwelling unit will be due at the time of building permit for <br />each lot. The City’s sewer charge is $5,380.00 per lot (6), or $32,280.00. <br /> <br />c. Park dedication: $33,300.00 ($5,550 x 6 new lots). <br /> <br />B. General conditions imposed on preliminary plats shall apply, and are as follow: <br />
The URL can be used to link to this page
Your browser does not support the video tag.