My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2020 Council Packet
Orono
>
City Council
>
2020
>
09-14-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2020 11:35:52 AM
Creation date
12/1/2020 11:23:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTES: <br />1.INFILTRATION BASIN TO BE DRY WITHIN 48 HOUR PERIOD, UNLESS DESIGNED OTHERWISE. <br />2.CONTRACTOR TO PROVIDE INFILTRATION TESTING AND OBTAIN APPROVAL BY ENGINEER. <br />3.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROTECT THE INFILTRATION BASIN <br />DURING CONSTRUCTION AND TO REMEDIATE ANY COMPACTED SOILS. <br /> Jul 22, 2020 - 11:36am - User:Csyverson L:\PROJECTS\20658.03\CAD\Civil\Sheets\20658.03-C9-DET.dwg <br />C9.02 <br />DETAILS <br />Project <br />Location <br />Date Submittal / RevisionNo. <br />Certification <br />Sheet Title <br />Summary <br />Revision History <br />Sheet No.Revision <br />Project No. <br />By <br />Designed:Drawn: <br />Approved:Book / Page: <br />Phase:Initial Issue: <br />Client <br />GORDON <br />JAMES <br />CONSTRUCTION <br />5159 MAIN STREET SUITE 200 <br />MAPLE PLAIN, MN 55359 <br />ORCHARD HILL <br />OF ORONO <br />ORONO, MN <br />JEB CJS <br />ETL <br />PRELIMINARY 04/22/2020 <br />20658.03 <br />Registration No.Date: <br />I hereby certify that this plan, specification or <br />report was prepared by me or under my direct <br />supervision and that I am a duly licensed <br />professional ENGINEER under the laws of the state <br />of Minnesota. <br />If applicable, contact us for a wet signed copy of this <br />plan which is available upon request at Sambatek's, <br />Minnetonka, MN office. <br />04/22/202050475 <br />Eric T. Luth <br />Registration No.Date: <br />I hereby certify that this survey, plan or report was <br />prepared by me or under my direct supervision <br />and that I am a duly Licensed LANDSCAPE <br />ARCHITECT under the laws of the State of <br />Minnesota. <br />This certification is not valid unless wet signed in blue <br />ink. If applicable, contact us for a wet signed copy of <br />this survey which is available upon request at <br />Sambatek, Minnetonka, MN office. <br />02/20/202040252 <br />William L. Delaney <br />04/22/20 City Submittal <br />05/01/20 MCWD Submittal <br />05/04/20 City Resubmittal <br />07/22/20 City Resubmittal <br />1 <br />3B <br />3A <br />4 <br />5 <br />2 <br />1.PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, <br />FERTILIZER, AND SEED. <br />2.BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" DEEP X 6" WIDE TRENCH WITH <br />APPROXIMATELY 12" OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. <br />ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" APART IN THE BOTTOM <br />OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO <br />COMPACTED SOIL AND FOLD REMAINING 12" PORTION OF BLANKET BACK OVER SEED AND <br />COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES <br />SPACED APPROXIMATELY 12" APART ACROSS THE WIDTH OF THE BLANKET. <br />3.ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL <br />WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED <br />TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS PER MANUFACTURES <br />RECOMMENDATION. <br />4.THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 4"-6" OVERLAP <br />DEPENDING ON BLANKET TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE <br />OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE SEAM STITCH ON THE <br />PREVIOUSLY INSTALLED BLANKET. <br />5.CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE <br />STYLE) WITH AN APPROXIMATE 3"OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY <br />12"APART ACROSS ENTIRE BLANKET WIDTH. <br />6.PLACE STAPLES/STAKES PER MANUFACTURE RECOMMENDATION FOR THE APPROPRIATE SLOPE BEING <br />APPLIED. <br />NOTES: <br />1.IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" MAY BE <br />NECESSARY TO PROPERLY SECURE THE BLANKETS. <br />2.FOLLOW EROSION CONTROL TECHNOLOGY COUNCIL SPECIFICATION FOR PRODUCT SELECTION <br />4"- 6" <br />6" <br />6" <br />12" <br />3" <br />N.T.S. <br />EROSION CONTROL BLANKET N.T.S. <br />1 <br />4 <br />6 <br />7 <br />5 <br />NOTES: <br />1.HORIZONTAL STAPLE SPACING SHOULD BE ALTERED <br />IF NECESSARY TO ALLOW STAPLES TO SECURE THE <br />CRITICAL POINTS ALONG THE CHANNEL SURFACE. <br />2.IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR <br />STAKE LENGTHS GREATER THAN 6" MAY BE <br />NECESSARY TO PROPERLY ANCHOR THE BLANKETS. <br />3.FOLLOW EROSION CONTROL TECHNOLOGY <br />COUNCIL SPECIFICATION FOR PRODUCT <br />SELECTION. <br />4"-6" <br />6" <br />6" <br />BA <br />B <br />A <br />8 <br />3 <br />12" <br />2 <br />1.PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. <br />2.BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" DEEP X 6" WIDE TRENCH WITH APPROXIMATELY 12" OF BLANKET <br />EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY <br />12"APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND <br />FOLD REMAINING 12"PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A <br />ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" APART ACROSS THE WIDTH OF THE BLANKET. <br />3.ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE <br />AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE <br />LOCATIONS AS PER MANUFACTURER'S RECOMMENDATIONS. <br />4.PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4"-6" OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" <br />APART AND 4" ON CENTER TO SECURE BLANKETS. <br />5.FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" <br />APART IN A 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. <br />6.ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 4"-6" (DEPENDING ON BLANKET TYPE) AND STAPLED. TO ENSURE PROPER <br />SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE SEAM STITCH ON <br />THE BLANKET BEING OVERLAPPED. <br />7.IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9m-12m) INTERVALS. USE A DOUBLE <br />ROW OF STAPLES STAGGERED 4" APART AND 4" ON CENTER OVER ENTIRE WIDTH OF THE CHANNEL. <br />8.THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN A 6" <br />DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. <br />9.PLACE STAPLE/STAKES PER MANUFACTURER'S RECOMMENDATION FOR THE APPROPRIATE CHANNEL FLOW OR SHORELINE APPLICATION <br />CRITICAL POINTS <br />A.OVERLAPS AND SEAMS <br />B.PROJECTED WATER LINE <br />C.CHANNEL BOTTOM/SIDE <br />SLOPE VERTICES <br />6" <br />4"-6" <br />6" <br />4" <br />4" <br />C <br />C <br />EROSION CONTROL BLANKETINFILTRATION BASIN DETAIL <br />N.T.S. <br />VARIES, SEE <br />GRADING PLAN <br />FINISHED GRAD <br />E <br />UNCOMPACTED INSITU SOIL <br />FINISHED GRADE <br />EL= 941.70 <br />3:1 SL <br />O <br />P <br />E <br /> <br />M <br />A <br />X <br />FES 101 <br />IE=942.50FES 100 <br />IE=941.20 <br />34 LF - 18" RCP @ 3.80%
The URL can be used to link to this page
Your browser does not support the video tag.