Laserfiche WebLink
AGENDA ITEM <br />Prepared By: J. Barnhart Reviewed By: DJR Approved By: DJR <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. To consider a sketch plan proposal that results in 4 single family lots. <br /> <br />2. Background. In March 2020, the City Council reviewed a proposal that resulted in 4 total lots; <br />two were new, and 2 were non-conforming as to lot area, and one lot non-conforming as to width. <br />The Council did not support creating non-conforming lots on a subdivision, and the applicant was <br />instructed to continue working on the proposal. <br /> <br />The applicant represents the individual owners of the parcels. <br /> <br />Over the last several months, the applicant and staff have worked on revisions to the proposal. <br />The applicant now promotes 4 total lots, all lots meet the minimum area requirement and all but <br />one lot is conforming to width. <br /> <br />*The Dry buildable calculation is predicated on the MCWD and City Council approval of the <br />proposal to reclaim 400 sq ft of the wetland. <br />**The portion of this lot north of the lagoon does not meet the width requirement. <br /> <br />Lot Analysis <br />2474 Carman, Tract A. This lot includes the existing structure. A portion of the proposed lot <br />extends north of the lagoon, to meet the minimum gross lot area. This lot does not meet the width <br />requirement, due to the configuration of the existing side lot lines. Due to the size of the portion <br />of the lot north of the lagoon, and the size and location of the wetland, there is not likely to be any <br />permit-able construction north of the lagoon. <br /> <br />2474 Carman, Tract B. The lot is a new lot, and meets the width (measured at the front yard <br />setback line) and has frontage on Shoreline Drive. The County will need to approve the driveway <br />location. This is not a lake lot. This lot proposes reclaiming 400 sq ft of wetland. This is <br />important because without the reclaimed wetland, about 5,000 sq ft of the lot is not contiguous, <br />and without it, the lot would not meet the minimum lot area requirement. The MCWD and the <br />City Council must approve wetland reclamation. The plans do show a conforming location for a <br />Required Proposed Required Proposed Required Proposed <br />Tract B North of Inlet (LR- <br />1C-1)21,780 26,301 21,780 21,780*100 125 Width Measured <br />at FSB <br />Tract A Mainly South of <br />Inlet (LR-1B)43,560 44,653 21,780 39,977 140 124 <br />Lot 1 North of Inlet (LR-1C- <br />1)21,780 40,815 21,780 26,418 100 103 <br />Lake Lot. Width <br />is measured at <br />OHWL and 75 <br />Lot 2 Mainly South of Inlet <br />(LR-1B)43,560 57,118 21,780 44,349 140 155** <br />Width is <br />measured at the <br />south shore <br />Width <br />West Side (2474 Carman Street) <br />East Side (2480 Carman Street) <br />Lot Analysis Dry BuildableLot Area (Sq Ft) <br />Item No.: 10 Date: August 24, 2020 <br />Item Description: LA20-000009 – Don Gamble o/b/o Scott Edwards and Kim A. <br />Edwards, 2474 and 2480 Carman Street, Revised Sketch Plan <br />Presenter: Jeremy Barnhart, AICP <br />Community Development Director <br />Agenda <br />Section: <br />Planning Department <br />Report