My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-13-2020 Council Packet
Orono
>
City Council
>
2020
>
08-13-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2020 11:26:53 AM
Creation date
12/1/2020 11:21:26 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L <br />a <br />k <br />e <br /> <br /> <br /> <br /> <br />M <br />i <br />n <br />n <br />e <br />t <br />o <br />n <br />k <br />a <br />C <br />a <br />s <br />c <br />o <br /> <br /> <br /> <br /> <br />P <br />o <br />i <br />n <br />t <br /> <br /> <br /> <br /> <br />R <br />o <br />a <br />d <br />S <br />1 <br />M <br />i <br />n <br />n <br />e <br />t <br />o <br />n <br />k <br />a <br />, <br /> <br />M <br />i <br />n <br />n <br />e <br />s <br />o <br />t <br />a <br /> <br /> <br />5 <br />5 <br />3 <br />4 <br />5 <br />P <br />h <br />o <br />n <br />e <br /> <br />( <br />9 <br />5 <br />2 <br />) <br /> <br />4 <br />7 <br />4 <br />- <br />7 <br />9 <br />6 <br />4 <br />1 <br />7 <br />9 <br />1 <br />7 <br /> <br />H <br />i <br />g <br />h <br />w <br />a <br />y <br /> <br />7 <br />W <br />e <br />b <br />: <br /> <br />w <br />w <br />w <br />. <br />a <br />d <br />v <br />s <br />u <br />r <br />. <br />c <br />o <br />m <br />A <br />d <br />v <br />a <br />n <br />c <br />e <br />S <br />u <br />r <br />v <br />e <br />y <br />i <br />n <br />g <br /> <br />& <br /> <br />E <br />n <br />g <br />i <br />n <br />e <br />e <br />r <br />i <br />n <br />g <br />, <br /> <br />C <br />o <br />. <br />LAKE <br />C <br />O <br />U <br />N <br />T <br />R <br />Y <br /> <br /> <br /> <br />B <br />U <br />I <br />L <br />D <br />E <br />R <br />S <br />2520 <br /> <br />C <br />A <br />S <br />C <br />O <br /> <br /> <br /> <br />P <br />O <br />I <br />N <br />T <br /> <br /> <br /> <br />R <br />O <br />A <br />D <br />CLIENT NAME / JOB ADDRESS <br />O <br />R <br />O <br />N <br />O <br />, <br /> <br /> <br /> <br /> <br />M <br />N <br />S <br />H <br />E <br />E <br />T <br /> <br />T <br />I <br />T <br />L <br />E <br />P <br />R <br />O <br />P <br />O <br />S <br />E <br />D <br /> <br /> <br />S <br />U <br />R <br />V <br />E <br />Y <br />S <br />H <br />E <br />E <br />T <br /> <br />N <br />O <br />. <br />S <br />H <br />E <br />E <br />T <br /> <br />1 <br /> <br />O <br />F <br /> <br />1 <br />DRAWING ORIENTATION & SCALE40200 <br />2 <br />0 <br />0 <br />9 <br />1 <br />9 <br /> <br /> <br /> <br />J <br />R <br />D <br />R <br />A <br />W <br />I <br />N <br />G <br /> <br />N <br />U <br />M <br />B <br />E <br />R <br />LEGAL DESCRIPTION:The southwesterly half og Lot 4, TOWNSITE OF LANGDON PARK, Hennepin County, Minnesota.SCOPE OF WORK & LIMITATIONS:1.Showing the length and direction of boundary lines of the legal description listed above. The scope of our servicesdoes not include determining what you own, which is a legal matter. Please check the legal description with yourrecords or consult with competent legal counsel, if necessary, to make sure that it is correct and that any matters ofrecord, such as easements, that you wish to be included on the survey have been shown.2.Showing the location of observed existing improvements we deem necessary for the survey.3.Setting survey markers or verifying existing survey markers to establish the corners of the property.4.This survey has been completed without the benefit of a current title commitment. There may be existingeasements or other encumbrances that would be revealed by a current title commitment. Therefore, this surveydoes not purport to show any easements or encumbrances other than the ones shown hereon.5.Showing elevations on the site at selected locations to give some indication of the topography of the site. We havealso provided a benchmark for your use in determining elevations for construction on this site. The elevationsshown relate only to the benchmark provided on this survey. Use that benchmark and check at least one otherfeature shown on the survey when determining other elevations for use on this site or before beginningconstruction.6.While we show a proposed location for this home or addition, we are not as familiar with your proposed plans asyou, your architect, or the builder are. Review our proposed location of the improvements and proposed yardgrades carefully to verify that they match your plans before construction begins. Also, we are not as familiar withlocal codes and minimum requirements as the local building and zoning officials in this community are. Be sureto show this survey to said officials, or any other officials that may have jurisdiction over the proposedimprovements and obtain their approvals before beginning construction or planning improvements to the property.7.Note that all building dimensions and building tie dimensions to the property lines, are taken from the siding andor stucco of the building.8.While we show the building setback lines per the City of Orono web site, we suggest you show this survey to theappropriate city officials to be sure that the setback lines are shown correctly. Do this BEFORE you use thissurvey to design anything for this site.STANDARD SYMBOLS & CONVENTIONS:"●" Denotes iron survey marker, set, unless otherwise noted. <br />S <br />H <br />E <br />E <br />T <br /> <br />S <br />I <br />Z <br />E <br />2 <br />2 <br /> <br /> <br />X <br /> <br /> <br />3 <br />4 <br />SCALE - 1" = 20' <br /># <br />L <br />I <br />C <br />E <br />N <br />S <br />E <br /> <br />N <br />O <br />. <br />D <br />A <br />T <br />E <br />J <br />U <br />N <br />E <br /> <br />9 <br />, <br /> <br />2 <br />0 <br />2 <br />0 <br />D <br />A <br />T <br />E <br /> <br />D <br />R <br />A <br />F <br />T <br />E <br />D <br />: <br />J <br />U <br />N <br />E <br /> <br />9 <br />, <br /> <br />2 <br />0 <br />2 <br />0 <br /># <br /> <br />5 <br />2 <br />7 <br />1 <br />6 <br />J <br />o <br />s <br />h <br />u <br />a <br /> <br />S <br />. <br /> <br />R <br />i <br />n <br />k <br />e <br />M <br />A <br />Y <br /> <br />1 <br />5 <br />, <br /> <br />2 <br />0 <br />2 <br />0 <br />D <br />A <br />T <br />E <br /> <br />S <br />U <br />R <br />V <br />E <br />Y <br />E <br />D <br />: <br />S <br />U <br />R <br />V <br />E <br />Y <br />E <br />D <br /> <br />B <br />Y <br />A <br />D <br />V <br />A <br />N <br />C <br />E <br /> <br />S <br />U <br />R <br />V <br />E <br />Y <br />I <br />N <br />G <br />. <br /> <br />& <br /> <br />E <br />N <br />G <br />. <br />, <br /> <br />C <br />O <br />. <br />GRADING & EROSION CONTROL NOTES:BEFORE DEMOLITION AND GRADING BEGIN·Install silt fence/bio roll around the perimeter of the construction area.·Sediment control measures must remain in place until final stabilization has beenestablished and then shall be removed. Sediment controls may be removed toaccommodate short term construction activity but must be replaced before the next rain.·A temporary rock construction entrance shall be established at each access point to thesite and a 6 inch layer of 1 to 2 inch rock extending at least 50 feet from the street intothe site and shall be underlain with permeable geotextile fabric. The entrance shall bemaintained during construction by top dressing or washing to prevent tracking or flowof sediments onto public streets, walks or alleys. Potential entrances that are not soprotected shall be closed by fencing to prevent unprotected exit from the site.·Contractor shall install inlet protection on all existing storm sewer inlets in accordancewith the city standard details. Inlet protection shall also be provided on all proposedstorm sewer inlets immediately following construction of the inlet. Inlet protection mustbe installed in a manner that will not impound water for extended periods of time or in amanner that presents a hazard to vehicular or pedestrian traffic.DURING CONSTRUCTION:·When dirt stockpiles have been created, a double row of silt fence shall be placed toprevent escape of sediment laden runoff and if the piles or other disturbed areas are toremain in place for more than 14 days, they shall be seeded with Minnesota Departmentof Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering with spraymulch.·A dumpster shall be placed on the site for prompt disposal of construction debris.These dumpsters shall be serviced regularly to prevent overflowing and blowing ontoadjacent properties. Disposal of solid wastes from the site shall in accordance withMinnesota Pollution Control Agency requirements.·A separate container shall be placed for disposal of hazardous waste. Hazardous wastesshall be disposed of in accordance with MPCA requirements.·Concrete truck washout shall be in the plastic lined ditch and dispose of washings assolid waste.·Sediment control devices shall be regularly inspected and after major rainfall events andshall be cleaned and repaired as necessary to provide downstream protection.·Streets and other public ways shall be inspected daily and if litter or soils ha <br />s <br /> <br />b <br />e <br />e <br />n <br />deposited it shall promptly be removed.·If necessary, vehicles, that have mud on their wheels, shall be cleaned befor <br />e <br /> <br />e <br />x <br />i <br />t <br />i <br />n <br />g <br /> <br />t <br />h <br />e <br />site in the rock entrance areas·Moisture shall be applied to disturbed areas to control dust as needed.·Portable toilet facilities shall be placed on site for use by workers and shall b <br />e <br /> <br />p <br />r <br />o <br />p <br />e <br />r <br />l <br />y <br />maintained.·If it becomes necessary to pump the excavation during construction, pump d <br />i <br />s <br />c <br />h <br />a <br />r <br />g <br />e <br />shall be into the stockpile areas so that the double silt fence around these are <br />a <br />s <br /> <br />c <br />a <br />n <br /> <br />f <br />i <br />l <br />t <br />e <br />r <br />the water before it leaves the site.·Temporary erosion control shall be installed no later than 14 days after the s <br />i <br />t <br />e <br /> <br />i <br />s <br /> <br />f <br />i <br />r <br />s <br />t <br />disturbed and shall consist of broadcast seeding with Minnesota Department <br /> <br />o <br />f <br />Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering wit <br />h <br /> <br />s <br />p <br />r <br />a <br />y <br />mulch.·Erosion control measures shown on the erosion control plan are the absolute <br /> <br />m <br />i <br />n <br />i <br />m <br />u <br />m <br />. <br />The contractor shall install temporary earth dikes, sediment traps or basins a <br />n <br />d <br />additional silt fencing as deemed necessary to control erosion.SITE WORK COMPLETION:·When final grading has been completed but before placement of seed or sod <br />a <br />n <br /> <br />“ <br />a <br />s <br />built” survey shall be done per City of Orono requirements to insure that gra <br />d <br />i <br />n <br />g <br /> <br />w <br />a <br />s <br />properly done.·When any remedial grading has been completed, sod or seeding shall be co <br />m <br />p <br />l <br />e <br />t <br />e <br />d <br />including any erosion control blankets for steep areas.·When turf is established, silt fence and inlet protection and other erosion co <br />n <br />t <br />r <br />o <br />l <br /> <br />d <br />e <br />v <br />i <br />c <br />e <br />s <br />shall be disposed of and adjacent streets, alleys and walks shall be cleaned a <br />s <br /> <br />n <br />e <br />e <br />d <br />e <br />d <br /> <br />t <br />o <br />deliver a site that is erosion resistant and clean.·Contractor shall maintain positive drainage of a minimum 2% slope away fr <br />o <br />m <br />proposed building.
The URL can be used to link to this page
Your browser does not support the video tag.