My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-16-2020 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2020-2029
>
2020
>
11-16-2020 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2020 2:01:53 PM
Creation date
11/17/2020 2:00:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISTANCES: /ALL <br /> SOLAR PANELS -OPTIMIZERS:5'MAX ENERGY <br /> OPTIMIZERS-INVERTERS:75'MAX un�t• <br /> INVERTERS-PV SUBPANEL:2' <br /> PV SUBPANEL-UTILITY FUSED AC DISCONNECT:2' COMPANY INFORMATION <br /> UTILITY FUSED AC DISCONNECT-TERMINAL BOX:2' <br /> TERMINAL BOX-OUTGOING METER:2' ALL ENERGY SOLAR,INC <br /> OUTGOING METER-INCOMING METER:2' 1264 ENERGY LANE <br /> TERMINAL BOX-MAIN ELECTRIC SERVICE:2' <br /> ST PAUL,MN 55108 <br /> (800)620-3370 <br /> CALL-OUTS: INFO@ALLENERGYSOLAR.COM <br /> 1:SOLAR PANELS CLIENT INFORMATION <br /> 2:OPTIMIZERS Kali Anderson <br /> 3:INVERTERS <br /> 4760 Bayside RD <br /> 4:PV SUBPANEL Maple Plain,MN 55359-9620 <br /> 5:UTILITY FUSED AC DISCONNECT PO Number <br /> 6:TERMINAL BOX <br /> 7:OUTGOING METER 00030523 <br /> 8:INCOMING METER I SYSTEM DETAILS <br /> I ®`Q- <br /> 9:MAIN ELECTRIC SERVICE �•� ♦ <br /> 10:HOUSE SERVICE METER '�� �0• NOTES: <br /> 11:HOUSE ELECTRIC SERVICE �0° ,I� <br /> 1.(2)SOLAREDGE SE10000H- <br /> US INVERTER(S)=20kW AC <br /> _„.011 <br /> 2.ARRAY 1: <br /> 155°AZIMUTH,18°TILT <br /> (49)REC 440W=21.56kW <br /> I <br /> 0 <br /> C <br /> r <br /> r <br /> m <br /> ACCOUNT:150-1693-4110 <br /> 7:1 PREMISE:NA <br /> v METER:38129830 <br /> NOTES: <br /> 1, AZIMUTH <br /> 1.LOCATION OF SERVICE PANEL AND ELECTRICAL ,',,,' <br /> EQUIPMENT ARE SHOWN.FINAL LOCATION MAY y� <br /> CHANGE , {7 <br /> 2.LOCATION OF SERVICE PANEL AND ADDITIONAL �' !I, IIS <br /> ELECTRICAL EQUIPMENT NOT DRAWN TO SCALE \I ' <br /> 3.AC DISCONNECT AND PRODUCTION METER WITHIN <br /> 10'OF MAIN SERVICE METER/BI-DIRECTIONAL 111111' REVISIONS <br /> METER. 24/7 UNESCORTED KEYLESS ACCESS TO BE I'I LAST:10/20/20 AM <br /> PROVIDED FOR UTILITY AC DISCONNECT,PV `/ <br /> PRODUCTION METER,&BI-DIRECTIONAL METER. . <br /> 4.PV EQUIPMENT SHALL BE INSTALLED IN <br /> ACCORDANCE WITH NEC 690 AND POSTED WITH <br /> APPLICABLE WARNINGS,SIGNAGE,AND PLAQUES <br /> PER NEC 705-10,690-17,&690-64(b)(5). PROJECT-PAGE TITLE <br /> LABELS LOCATED ON PV PRODUCTION METER,BI- SITE MAP <br /> DIRECTIONAL METER,AC DISCONNECT(S),INVERTER(S),AND <br /> APPROPRIATE LABELS ON MAIN ELECTRIC SERVICE.ALL <br /> LABELS ARE PERMANENT,WEATHERPROOF,AND DURABLE <br /> THERE ARE NO CLEARANCE ISSUES DUE TO OVERHEAD <br /> BAYSIDE RD PAGE NUMBER <br /> POWERLINES. A5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.