My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-17-2020 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2020-2029
>
2020
>
08-17-2020 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 9:20:25 AM
Creation date
10/16/2020 9:18:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IOR TO DISCHt .. THE <br /> E TREATMENT )BTAINED IN THE B. CONTRACTOR SHALL ENSI THAT ALL PERMANENT STORMWATER TREATMENT SYSTEI ,RE <br /> 0 ENSURE ADLL,LJATE TREATMENT. CONSTRUCTED IN ACCORD _E WITH THE REQUIREMENTS OF THE NPDES PERMIT. <br /> A MANNER THAT DOES NOT CAUSE C. CONTRACTOR SHALL REMOVE ALL TEMPORARY SYNTHETIC AND STRUCTURAL BMPS. <br /> :D OVER AN ACCEPTED ENERGY <br /> WATER OR DOWNSTREAM RECORD AVAILABLITY AND RETENTION: <br /> >NTRACTOR SHALL HAUL THE -THE CONTRACTOR SHALL MAKE THE SWPPP, INCLUDING ALL CERTIFICATES, REPORTS, RECORDS, OR OTHEI <br /> INFORMATION OF THE PERMIT, AVAILABLE TO FEDERAL, STATE, OR LOCAL OFFICIALS WITHIN 72 HOURS UPO <br /> 'ATER TO THE BEGINNING OF THE REQUEST FOR THE DURATION OF THE PERMIT AND FOR THREE YEARS FOLLOWING THE SUBMITTAL OF THE <br /> '0 THE SITE IN A MANNER THAT NOTICE OF TERMINATION. <br /> -THE CONTRACTOR SHALL MAKE THE RESPONSIBLE PERSON, TRAINED AS REQUIRED BY THIS PERMIT, <br /> AVAILABLE ON SITE WITHIN 72 HOURS WHEN REQUESTED BY THE MPCA FOR AN ONSITE INSPECTION. <br /> G INSPECTIONS AND MAINTENANCE: <br /> JTROL BMPS THAT ARE INSPECTION AND ENTRY: <br /> ZEPLED, OR SUPPLEMENTED WITH -THE CONTRACTOR MUST ALLOW ACCESS AS REQUIRED BY STATE REGULATIONS FOR REPRESENTATIVES OF <br /> WISE <br /> WISE IN ACCORDANCE WITH THE THE MPCA OR ANY MEMBER THEREOF WHEN AUTHORIZED BY IT, TO ENTER UPON THE PROJECT SITE FOR <br /> E ANY ADDITIONAL EROSION THE PURPOSE OF OBTAINING INFORMATION, EXAMINATION OF RECORDS, OR CONDUCTING SURVEYS OR <br /> IRS OF NOTICE FROM MPCA. INVESTIGATIONS. <br /> ( 7 DAYS DURING ACTIVE <br /> TREATER THAN 0.5 INCHES IN 24 <br /> NOTICE OF TERMINATION: <br /> CTION MUST BE RECORDED IN -PERMITTEE MUST SUBMIT A NOTICE OF TERMINATION (NOT) WITHIN 30 DAYS IF ONE OR MORE OF THE <br /> TRACTOR. MAINTENANCE MUST BE FOLLOWING CONDITIONS HAVE BEEN MET: <br /> T. CONTRACTOR'S RECORDS MUST 1. FINAL STABILIZATION HAS BEEN ACHIEVED ON ALL PORTIONS OF THE SITE FOR WHICH PERMITTEE IS <br /> RESPONSIBLE INCLUDING THE REMOVAL OF ALL TEMPORARY MEASURES SUCH AS SILT FENCE. <br /> 2. ANOTHER OWNER HAS ASSUMED CONTROL OVER ALL PORTIONS OF THE SITE THAT HAVE NOT ACHIEVED <br /> FINAL STABILIZATION. <br /> CORRECTIVE ACTION. <br /> COMPLETING MAINTENANCE 8. CHANGES TO SWPPP <br /> -THE PERMITTEE MUST AMEND THE SWPPP AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS, SUCH <br /> IN 24 HOURS. ADDITIONAL OR MODIFIED BMPS, DESIGNED TO CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS <br /> THE INSPECTION, A RECORD OF WHENEVER: <br /> SCHARGE MUST BE MADE, AND THE 1. THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION OR MAINTENANCE, WEATHER OR SEASONAL <br /> SETTLED, OR SUSPENDED SOLIDS, CONDITIONS THAT HAVE SIGNIFICANT EFFECT ON DISCHARGE. INSPECTION IS REQUIRED WITHIN 24 HOURS <br /> SHED. OF A RAINFALL EVENT GREATER THAN ONE-HALF INCH. <br /> 2. INSPECTION OR INVESTIGATION BY SITE OPERATORS, LOCAL, STATE OR FEDERAL OFFICIALS INDICATE THE <br /> SWPPP IS NOT EFFECTIVE. <br /> NSPECTIONS CAN BE REDUCED TO 3. THE SWPPP IS NOT ACHIEVING THE GENERAL OBJECTIVES OF CONTROLLING POLLUTANTS OR THE SWPPP <br /> "OR FOR MINIMUM PERIOD OF 12 NOT CONSISTENT WITH THE TERMS AND CONDITIONS OF THIS PERMIT. <br /> JNOFF OR PRIOR TO RESUMING <br /> u1ES FIRST. 4. THE MPCA DETERMINES THAT DISCHARGE MAY CAUSE OR CONTRIBUTE TO NON-ATTAINMENT OF ANY <br /> ITENANCE OF BMPS UNTIL ANOTHER APPLICABLE WATER QUALITY STANDARDS OR THE SWPPP DOES NOT INCORPORATE THE REQUIREMENTS <br /> RGONE FINAL STABLIZATION AND AN RELATED TO AN APPROVED TOTAL MAXIMUM DAILY LOAD (TMDL). <br /> AINED BY CONTRACTOR ACCORDING 9. SWPPP CERTIFICATION: <br /> ) IN ACCORDANCE WITH THE - THIS STORMWATER POLLUTION PREVENTION PLAN WAS PREPARED BY INDIVIDUAL(S) TRAINED IN <br />
The URL can be used to link to this page
Your browser does not support the video tag.