Laserfiche WebLink
HET1C, S'1'RUCTURAL, <br /> ON AND SEDIMENT CONTROL <br /> 3 UNDERGONE FINAL STABILIZATION <br /> N HAS BEEN ESTABLISHED, MINIMUM <br /> I' IS 70% COVER, MAINTAIN ALL <br /> OL DEVICES UNTIL 70% <br /> EYED. <br /> CONCRETE BATCH PLANTS <br /> LIC RIGHT-OF-WAY. UNDER NO <br /> )UT WATER DRAIN ONTO THE PUBLIC <br /> -STORM SEWER. CONTRACTOR SHALL <br /> )ING DESIGNATED CONCRETE <br /> ,IES WITH MPCA REQUIREMENT. <br /> [ENTS ARE TEMPORARY. <br /> JSION CONTROL ELEMENTS PRIOR TO <br /> ACTIVITIES, MAINTAIN IN GOOD <br /> JCTION AND REMOVE FROM THE SITE <br /> PAVING AND TURF ESTABLISHMENT. <br /> PLACED ALONG THE PERIMETER OF <br /> ION CONTROL SHALL BE PLACED SO <br /> FISTING PAVEMENT OR DRIVE LANES <br /> METHODS OF EROSION CONTROL <br /> NTRACTOR'S RESPONSIBILITY TO <br /> 'APPROPRIATE TO THE SITE <br /> H MEETS THE CITY OF ORONO AND <br /> ,LLY SHOWN ON THE PLANS FOR <br /> �D IN THE MOST APPROPRIATE <br /> EXISTING PAVEMENT AND/OR CURBS <br /> RENT AND/nR CURBS SHALL BF PAID <br /> TOR. SEE DETAILS AND <br /> ;MPORARY SEED AND MULCH ON <br /> N 7 DAYS AFTER ROUGH <br /> WITH ANNUAL RYE SEED AT <br /> MULCH FIBER AT 45 LBS PER <br /> RT AND/OR DEBRIS FROM <br /> BEING TRANSPORTED OFF-SITE <br /> �R. CONTRACTOR TO VERIFY AT <br /> ORM SEWER SYSTEM IS CLEAR <br /> S AND IS FULLY FUNCTIONAL. <br />