Laserfiche WebLink
Private Roadway Width 24' wide back of curb-back of <br /> curb <br /> Private Parking Stalls 9' x 20' <br /> Site Access, Pedestrian Circulation and Parking <br /> Vehicular access from public right of way to the proposed development will occur via two proposed road <br /> accesses to Kelley Parkway. <br /> The development will be providing a 4' walkway connection to every unit's front door. The 4' walks will <br /> then connect to either; a 4' private walkway network within the development or to a proposed 5' public <br /> walk along Willow Drive or to an existing public walk on Kelley Parkway. <br /> The development will have ample parking to support the future residents and their guests. The plan as <br /> proposed provides the following parking: <br /> Parking Summary <br /> Off-street Guest 9 <br /> Public on-street No parking allowed Kelley Pkwy, Willow Dr or Wayzata Blvd <br /> Frontage <br /> Private Driveway(2/home) 86 <br /> Private Garage(2/home) 86 <br /> Total Available Parking 181 Stalls(4.2 stalls/unit) <br /> Grading <br /> The existing site area will be re-graded to shape in the proposed roadways, lot configurations, common <br /> area and all required stormwater management storage. The site will be graded to match elevations at the <br /> site perimeter and to capture site drainage as able. The elevation changes necessary to provide drainage <br /> within the site and to maintain maximum walkway and driveway slopes, does mean there will be <br /> situations where some private walkways will require private steps to make connections. The steps will be <br /> provided by means of 7"maximum height risers with railings when more than 1 step is needed. <br /> Sanitary Sewer and Watermain <br /> The proposed development would connect to public sanitary sewer and watermain within Kelley Parkway <br /> and extend public utilities within the development under the private roadway. The public utilities would <br /> be contained within a 50' wide outlot that will be covered by public drainage and utility easement. <br /> Stormwater Management <br /> The development site falls within the Minnehaha Creek Watershed Management Organization (MCWD) <br /> boundary; therefore,the project will be subject to stormwater management regulations of the MCWD and <br /> the City of Orono. <br /> The site abuts an existing regional stormwater management basin. It is our understanding that the basin <br /> has been designed to accommodate some stormwater management for the development site. Any <br /> additional stormwater management required under current regulation will be provided onsite and could <br /> Concept/ Sketch Plan Review August 13, 2020 <br /> ORONO CROSSSINGS Page 4 of 5 <br />