My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-17-2020 Planning Commission Packet
Orono
>
Planning Commission
>
2020
>
08-17-2020 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 9:20:25 AM
Creation date
10/16/2020 9:18:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FILE#LA20-52 <br /> September 21,2020 <br /> Page 2 of 5 <br /> the table below: <br /> Section Standard Flexibility Requested? <br /> 1 (1) Minimum area: 5 acres or No. Part of the Stonebay <br /> tied to adjacent RPUD RPUD <br /> 2 Uses. Allowed: Multifamily <br /> residential <br /> 3 Sewer availability No. Sewer is available and <br /> the density is greater than 1 <br /> unit or 2 acres <br /> 4 Density. Each development in No,assuming approval of <br /> the RPUD district shall have a amendment. <br /> density within the range <br /> specified in the comprehensive <br /> plan for the specific site. <br /> 5 Incentives.The city may utilize None requested <br /> incentives to encourage the <br /> construction of projects which <br /> are consistent with the city's <br /> housing goals. <br /> 6 Floor Ratio Ratio, up to 1.0 To be determined <br /> 7a Setbacks Yes. External street setbacks <br /> not met. <br /> 7b Height,stories, roof style No. To be verified <br /> 7c Outside storage No. None proposed. <br /> 11 10%Private Recreational Area No,tot lot shown <br /> (Active and/or Passive) <br /> 12 Common Ownership No. <br /> 13 Signage Signage plans not yet <br /> developed <br /> 14 Landscaping Landscaping Plans not yet <br /> developed <br /> 15 Architectural Standards Final plans not developed, <br /> but are anticipated to be <br /> based on Stonebay palette. <br /> 16 Flexibility from standards Allowed and requested <br /> 17 Traffic Studies Not suggested <br /> 18 Building Permits Expected <br /> 19 General regulations applicability Expected <br /> 20 Lighting No. Lighting plan not yet <br /> developed <br /> 21 Trails Sidewalks and public walks <br /> proposed <br />
The URL can be used to link to this page
Your browser does not support the video tag.