Laserfiche WebLink
CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> 7 <br /> y� 1 NO. <br /> L 1 9 <br /> "IkESHO°- <br /> a. Stormwater and Drainage Trunk: The property will be subject to the Stormwater <br /> and Drainage Trunk Fee (SW&DT Fee) of$32,240.00 (Number of new lots (4) <br /> times per lot amount($8,060). <br /> b. Sewer: The costs to construct the Sewer system within the site will be the <br /> developers responsibility. The Metropolitan Council SAC charge which is <br /> currently $2,485 per dwelling unit will be due at the time of building permit for <br /> each lot. The City's sewer charge is $5,380.00 per lot(5), or$26,900.00. <br /> c. Park dedication: $22,200.00 ($5,550 x 4 new lots). <br /> B. General conditions imposed on preliminary plats shall apply, and are as follow: <br /> 1. Appropriate traffic control signage within and pertinent to the site shall be installed <br /> by the Developer subject to the City Engineer's review and approval. <br /> 2. Applicant shall demonstrate to the satisfaction of the City Council that all <br /> requirements of the Minnehaha Creek Watershed District as administrator of the <br /> WCA regulations on Orono's behalf, are complied with. <br /> 3. Erosion control shall adhere to "Best Management Practices for Protecting Water <br /> Quality in Urban Areas" and to the approved SWPPP. All erosion controls as <br /> required by the City and the MCWD shall be in place prior to commencing grading <br /> and excavation on the site. All such erosion control measures shall be maintained <br /> in working order until the site is vegetated and stabilized. <br /> 4. The construction limits shall be clearly marked with adequate fencing to prevent <br /> any construction damage or disturbance of any trees and vegetation outside of the <br /> construction limits area. Developer shall identify trees to be preserved on site, shall <br /> mark them on a site plan, and shall take extraordinary measures such as fencing, <br /> signage, etc. to ensure they are not disturbed. <br /> 5. This approval is based upon the known issues that may affect this project, but this <br /> approval does not limit the City from revising or amending these conditions as the <br /> review process continues. <br /> 6. Council approval is based on the entire record, above Findings. <br /> 4 <br />