Laserfiche WebLink
Ua <br /> y <br /> , <br /> DUNKI,EY UNDERGROUND STORMWATER SYSTEMs, <br /> 0 <br /> ,. <br /> ORONO, MN „,, <br /> a <br /> :_,,s: 0 z <br /> Saga Hill North Arm ” i rJ Shorc?.0 iMip <br /> 1gs Bay ,,,sso s,,� <br /> P 0, Crystal Bay <br /> Smiths Bay <br /> Crystal Bay <br /> West Arm <br /> Minnetonka Beach <br /> «e Dr, <br /> Spring Park ,, <br /> o- Lafayette Bay Lake Minnetonka <br /> Big <br /> �� Island <br /> Qom/ Mahpiyata <br /> F SITE LOCATION Island intilatimmor <br /> MINNESOTA <br /> Island Park <br /> Cli 1ZZ"' + E <br /> ShadyTonka Bay �•` r f <br /> Island ,• Greer •C Os M <br /> o a <br /> Enchanted Gideon Bay 0.W w`1('' <br /> 3 <br /> Island <br /> ORONO LI <br /> awatosa ExcelsiorIIIIIIIII <br /> Island Eureka 0„ <br /> Shorewood Fr <br /> 0 <br /> w8 t (2 war d <br /> O n O Q O U¢5 Q <br /> fiemsimmt <br /> 0 20 40 0 0.5 <br /> Miles Miles z <br /> Ow <br /> CITY OF ORONO: GENERAL NOTES: 0} <br /> 1. EXISTING INFORMATION TAKEN FROM SURVEY BY GRONBERG&ASSOCIATES,INC.,LATEST REVISION DATED 5-11-2020,PROJECT NUMBER 20-046A. cc c/j <br /> p Cr <br /> a MELANIE CURLS, PLANNER BACKGROUND SURVEY ON THESE DRAWINGS IS FOR REFERENCE ONLY.REFER TO CERTIFIED SURVEY AS THE BASIS FOR ALL PROJECT WORK. Z LU <br /> 952.249.4627 <br /> ART TAYLOR, CITY 2. BENCHMARKS ARE INCLUDED ON DRAWING NO.1.BENCHMARKS ARE PROVIDED AS TWO(2)TNH,NGVD 1929. Q <br /> } <br /> E INSPECTOR 3. CONTRACTOR WILL NOTIFY ENGINEER OF MONUMENTS OR BENCHMARKS THAT ARE DISTURBED BY CONSTRUCTION. <br /> 612.756.2048 <br /> s 4. OWNER WILL STAKE EASEMENTS AS REQUIRED FOR CONTRACTOR TO PERFORM INSTALLATION. _i2 <br /> F DRAWING INDEX 5. CONTRACTOR SHALL NOTIFY GOPHER STATE ONE-CALL AND OBTAIN PUBLIC AND PRIVATE UTILITY LOCATIONS PRIOR TO INITIATING WORK. w Z O i <br /> 6. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS INCLUDING LOCATIONS OF EXISTING PUBLIC AND PRIVATE UTILITIES AND NOTIFY ENGINEER 'o Z . <br /> ENGINEER: OF DISCREPANCIES AFFECTING THE WORK PRIOR TO STARTING CONSTRUCTION. a 0 co <br /> E 7. ALL EXISTING UTILITIES AND OTHER IMPROVEMENTS ARE TO REMAIN UNLESS NOTED OTHERWISE. <br /> s <br /> SHEET TI TLE 8. ALL LANDSCAPING AND EXISTING TREES AND SHRUBS ARE TO REMAIN UNLESS NOTED OTHERWISE. <br /> PINNACLE ENGINEERING, INC. 9. SUBSURFACE GEOTECHNICAL INVESTIGATION REPORT AVAILABLE UPON REQUEST. <br /> BETH KEISTER, P.O. NO. 10. CONTRACTOR TO KEEP FROM DAMAGING EXISTING IMPROVEMENTS,LANDSCAPING,STRUCTURES AND UTILITIES THAT ARE TO REMAIN. <br /> 11541 95TH AVENUE NORTH CONTRACTOR TO REPAIR DAMAGE AT OWN EXPENSE. <br /> P. MINNEAPOLIS, MN 55369 00 TITLE SHEET 11. ALL WORK TO CONFORM TO CITY OF ORONO,MINNEHAHA CREEK WATERSHED DISTRICT,FEDERAL,STATE OF MINNESOTA AND OTHER APPLICABLE <br /> 763.277.8408 1 BKEISTERdPINENG.COM STANDARDS AND REGULATIONS. i <br /> y 01 EXISTING CONDITIONS 12. ALL EXCAVATIONS WILL COMPLY WITH THE REQUIREMENTS OF OSHA 29 CFR,PART 1926,SUBP.P.,"EXCAVATIONS AND TRENCHES."THIS Q <br /> DOCUMENT STATES THAT EXCAVATION SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. <br /> i UTILITY CONTACTS: 02 PROPOSED SAND FILTER LAYER 13. CATCHBASINS AND MANHOLES ARE SHOWN ON PLAN LARGER THAN ACTUAL SIZE.COORDINATE LOCATIONS OF CATCHBASIN AND MANHOLE 'ACOVERS AND CASTINGS WITH PIPING AND OTHER FEATURES. <br /> 8 03 PROPOSED CONDITIONS SYSTEM 14. COORDINATE WITH OWNERS ON WORK OUTSIDE OF EASEMENTS,BUT WITHIN PROPERTY BOUNDARIES OF 2709 WALTERS PORT LANE AND 2710 I— o <br /> 4 GOPHER STATE ONE CALL PENCE LANE. W B <br /> CALL 48 HOURS PRIOR TO EXCAVATION 04 DETAILS 15. DO NOT PERFORM WORK OUTSIDE OF PROPERTY BOUNDARIES.ANY WORK REQUIRED TO BE PERFORMED OUTSIDE OF PROPERTY BOUNDARIES W B °z <br /> :S. TO LOCATE UTILITIES MUST BE APPROVED BY OWNER AND ALL REGULATING GOVERNMENTAL ENTITIES AND APPROPRIATE PERMITS MUST BE OBTAINED. I w a <br /> ao 651.454.0002 16. CONTRACTOR IS WILL OBTAIN PERMITS AND PAY FEES ASSOCIATED WITH CONSTRUCTING THIS WORK. <br /> 05 DETAILS 17. PROVIDE TRAFFIC CONTROL,AS REQUIRED,AT STREETS AND SIDEWALKS AND PUBLIC RIGHT-OF-WAY PER CITY OF ORONO,HENNEPIN COUNTY e W ` <br /> AND MNDOT REQUIREMENTS.TRAFFIC CONTROL DESIGN,RELATED PERMITTING,AND DRAWINGS SHALL BE THE RESPONSIBILITY OF THE <br /> FT-, CONTRACTOR. o I` o <br />