My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7044
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 7000 - 7099 (July 8, 2019 - May 26, 2020)
>
Resolution 7044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2020 10:49:25 AM
Creation date
8/13/2020 9:24:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
%O./yp CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> y� G NO. 7044 - <br /> CONCLUSIONS, ORDER AND CONDITIONS: <br /> Based upon one or more of the above findings, the Orono City Council hereby grants a <br /> variance to Orono Municipal Zoning Code Section 78-1279 to allow construction of an accessory <br /> building, a barn not to exceed 1,800 square foot in footprint, subject to the following conditions: <br /> 1. Council approval is based on the entire record, above Findings. <br /> 2. The approved project shall conform to the survey dated 09/12/19 by W. Brown Land <br /> Surveying and building plans submitted by the Applicants and annotated by City staff, <br /> attached to this Resolution as Exhibits A& B. <br /> 3. Any amendments to the plans which are not in conformity with City codes may require <br /> further Planning Commission and City Council review. <br /> 4. By signing this Resolution, the Applicants agree to the filing of a covenant in the title of <br /> the Property. The barn is considered an oversize accessory building (an "OAB"), and <br /> shall be allowed only when the Applicants agree and covenant in writing with the city <br /> as follows: <br /> a. No future subdivision will be approved that places the OAB within a lot that has <br /> no principal building, except that the city in its subdivision approval may grant a <br /> finite time period in which the OAB may remain without a principal building, in <br /> order that a principal building may be constructed. At the end of this time <br /> period, the OAB must be removed if no principal building has been constructed. <br /> b. If the Property is subdivided, the OAB and principal building will be located <br /> together within a lot that meets the minimum lot area requirement for the given <br /> size of the OAB. <br /> c. In subdivision approval, the setback required for the OAB shall remain. <br /> d. Such covenant shall be binding on current and future property owners and shall <br /> be filed in the chain of title of the Property. <br /> 5. Authorities granted by this resolution run with the Property not with the Applicants, but are <br /> permissive only and must be exercised by obtaining a building permit for the barn and <br /> commencing construction of said project. A framing inspection must be completed within <br /> one year of the date of Council approval, or the variance will expire on that date(November <br /> 12, 2020). <br /> 6. Violation of or non-compliance with any of the terms and conditions of this resolution may <br /> result in the termination of any authority granted herein. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.