My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01098 - septic mound system
Orono
>
Property Files
>
Street Address
>
G
>
Graham Hill Road
>
3205 Graham Hill Road - 05-117-23-14-0065
>
Septic
>
2012-01098 - septic mound system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:18:51 PM
Creation date
7/10/2020 11:24:08 AM
Metadata
Fields
Template:
x Address Old
House Number
3205
Street Name
Graham Hill
Street Type
Road
Address
3205 Graham Hill Rd
Document Type
Septic
PIN
0511723140065
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. i.l� `1 <br /> �� <br /> OSTP Mound Materials Worksheet UNIVERSITY <br /> Minnesota Poliution OF MINNESOTA � ����, <br /> Control Agency _ <br /> ProjectlD: v 11.09.22 <br /> A• Calculate Bed (rock)Volume:Bed Length (2.0 X Bed Width 2.B)X Depth =Volume ft3 <br /> 63.0 ft X 10.0 ft X t.0 = 630.0 ft' <br /> Divide ft;by 27 ft3/yd;to calculate cubic ards: <br /> 630.0 ft' : z7 = 23.3 yd' <br /> Add 20%for constructability: 23,3 yd3 X 1.2 = 28.0 yd' <br /> B. Catcutate Clean Sond Volume: <br /> Volume Under Rock bed:Average Sand Depth x Media Widtl� x Media Length =cubic feet <br /> 2.1 ft X 10.0 ft X 63.0 ft = 1312.5 ft' <br /> For a Mound on a slope from 0-1% <br /> Volume from Lem3th=((Upslope AAound Height-1)X Absorption Width Beyond Bed X Media Bed Length) <br /> ft -1) X X ft = <br /> Volume from Width=((Upslope Mound Height-1)X Absorption Width Beyand Bed X AAedia Bed Width) <br /> ft -1) X X �-_�ft = <br /> Total C(ean Sand Volume:Volume from Length+Vo(ume from Width+Volume Under Medio <br /> ft' + ft3 + ft' = ft' <br /> For a Mound on a slope greater than 1% <br /> Upslope Volume:((Upsfope Mound Height -1)x 3 x Bed Length)t 2=cubic feet <br /> (( 3.3 ft -�) X 3.0 ft X 63.0 )�z= 220.5 ft' <br /> Downsiope Volume:((Downs(ope Height- 1) x Dowrislope Absorption Width x Media Length)+2=cubic feet <br /> (( 4.8 ft-1) x 10.0 ft x 63.0 )�2= 1207.5 ft' <br /> Endslope Volume:(Downs(ope Mound Height- 1)x 3 x Medio Width =cubic feet <br /> ( 4.8 ft-1 ) X 3.0 ft X 10.0 ft = �15.0 ft' <br /> Total C(ean Sand Volume:Upslope Volume +Downslope Volume +Endslope Volume +Volume Under Media <br /> 220.5 ft' + 1207.5 ft' + 115.0 ft' + 1312.5 ft'= C855.5 ft' <br /> Divide ft'by 27 ft3/yd'to calculate cubic yards: 2855.5 ft' = 27 = 105.8 yd3 <br /> Add 20%for constructabitity: 105.8 yd X 1.2 = 126.9 <br /> s yd3 <br /> C. Calculate Sandy Berm Volume: <br /> Total Berm Volume(npprox):((Avg.Mound Height-0.5 ft topsoil)x Mound Width x Mound Length)�2=cubic feet <br /> ( 4.1 _ 0.5 )ft X 47.0 ft X 93.0 )=2= 7831.4 f�' <br /> Total Mound Vo(ume-Ciean Sand volume-Rock Volume=cubic feet <br /> 7831.4 ft' - 2855.5 ft' - 630.0 ft3 = 4345.9 tt' <br /> Divide ft'by 27 ft'/yd'to calcu►ate cubic yards: 4345.9 ft' = Z7 = 161.0 yd3 <br /> Add 20%for constructability: 161.0 yd' x 1.2 = 1 q3,2 yd' <br /> D.Calculate Topsor!Materia!Volume:Total Mound Width X Totol Mound Length X.5 Jt <br /> 47.0 ft x 93.0 ft X 0.5 ft = C2185.5 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 2185.5 ft' : 27 = 80.9 yd3 <br /> Add 20%for corntructabitity: 80.9 yd' x 1 Z = q7,1 yd' <br />
The URL can be used to link to this page
Your browser does not support the video tag.